规划埃及固体废物管理质量保证方案

Rehab O. Abdel Rahman, A. M. El-kamash, F. A. Shehata, M. R. El-Sourougy
{"title":"规划埃及固体废物管理质量保证方案","authors":"Rehab O. Abdel Rahman, A. M. El-kamash, F. A. Shehata, M. R. El-Sourougy","doi":"10.1002/QAJ.408","DOIUrl":null,"url":null,"abstract":"Over the past 40 years, a considerable amount of solid radioactive waste has been generated in Egypt from a variety of nuclear technology applications in research, medicine, and industry. The Hot Laboratory and Waste Management Center at Inshas, Cairo, has started to build an integrated waste management system to ensure the safe management of this radioactive waste. During the establishment of this system, a range of technological options have been identified and evaluated in order to select and justify the most appropriate option for each waste type, taking into account the basic waste management principles, regulatory requirements, available resources, and other technical and non-technical factors. Unfortunately, some of the generated wastes were not under a Quality Assurance Program that provides maintenance of traceability to production or conditioning records. So, these wastes are considered unacceptable to be placed in the disposal facility and need to be characterized and brought to an acceptable condition prior to disposal. This must be done in accordance with comprehensive plans and documented procedures to guarantee the safe handling, storage, and disposal. In this work, the existing Egyptian solid waste management system will be presented with a special reference to a management plan to be applied through this system. This will include a description of the organizational structure, functional responsibilities, organizational interfaces, personnel training, documentation, and corrective action. Copyright © 2007 John Wiley & Sons, Ltd.","PeriodicalId":147931,"journal":{"name":"Quality Assurance Journal","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Planning for a solid waste management quality assurance program in Egypt\",\"authors\":\"Rehab O. Abdel Rahman, A. M. El-kamash, F. A. Shehata, M. R. El-Sourougy\",\"doi\":\"10.1002/QAJ.408\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Over the past 40 years, a considerable amount of solid radioactive waste has been generated in Egypt from a variety of nuclear technology applications in research, medicine, and industry. The Hot Laboratory and Waste Management Center at Inshas, Cairo, has started to build an integrated waste management system to ensure the safe management of this radioactive waste. During the establishment of this system, a range of technological options have been identified and evaluated in order to select and justify the most appropriate option for each waste type, taking into account the basic waste management principles, regulatory requirements, available resources, and other technical and non-technical factors. Unfortunately, some of the generated wastes were not under a Quality Assurance Program that provides maintenance of traceability to production or conditioning records. So, these wastes are considered unacceptable to be placed in the disposal facility and need to be characterized and brought to an acceptable condition prior to disposal. This must be done in accordance with comprehensive plans and documented procedures to guarantee the safe handling, storage, and disposal. In this work, the existing Egyptian solid waste management system will be presented with a special reference to a management plan to be applied through this system. This will include a description of the organizational structure, functional responsibilities, organizational interfaces, personnel training, documentation, and corrective action. Copyright © 2007 John Wiley & Sons, Ltd.\",\"PeriodicalId\":147931,\"journal\":{\"name\":\"Quality Assurance Journal\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Quality Assurance Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/QAJ.408\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality Assurance Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/QAJ.408","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

在过去的40年里,埃及在研究、医学和工业方面的各种核技术应用产生了相当数量的固体放射性废物。位于开罗Inshas的热实验室和废物管理中心已经开始建立一个综合废物管理系统,以确保对这种放射性废物的安全管理。在建立这一系统期间,已确定和评价了一系列技术选择,以便考虑到废物管理的基本原则、管制要求、现有资源以及其他技术和非技术因素,为每种废物类型选择最适当的选择并证明其合理性。不幸的是,一些产生的废物没有在质量保证计划下,该计划提供对生产或调节记录的可追溯性的维护。因此,这些废物被认为是不可接受的,不能放置在处置设施中,需要在处置前对其进行表征并使其达到可接受的条件。这必须按照全面的计划和文件程序进行,以保证安全处理、储存和处置。在这项工作中,将介绍现有的埃及固体废物管理系统,并特别提到将通过该系统实施的管理计划。这将包括对组织结构、职能职责、组织接口、人员培训、文件和纠正措施的描述。版权所有©2007 John Wiley & Sons, Ltd
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Planning for a solid waste management quality assurance program in Egypt
Over the past 40 years, a considerable amount of solid radioactive waste has been generated in Egypt from a variety of nuclear technology applications in research, medicine, and industry. The Hot Laboratory and Waste Management Center at Inshas, Cairo, has started to build an integrated waste management system to ensure the safe management of this radioactive waste. During the establishment of this system, a range of technological options have been identified and evaluated in order to select and justify the most appropriate option for each waste type, taking into account the basic waste management principles, regulatory requirements, available resources, and other technical and non-technical factors. Unfortunately, some of the generated wastes were not under a Quality Assurance Program that provides maintenance of traceability to production or conditioning records. So, these wastes are considered unacceptable to be placed in the disposal facility and need to be characterized and brought to an acceptable condition prior to disposal. This must be done in accordance with comprehensive plans and documented procedures to guarantee the safe handling, storage, and disposal. In this work, the existing Egyptian solid waste management system will be presented with a special reference to a management plan to be applied through this system. This will include a description of the organizational structure, functional responsibilities, organizational interfaces, personnel training, documentation, and corrective action. Copyright © 2007 John Wiley & Sons, Ltd.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信