{"title":"为满足新型工业用户的用电需求,开发了一种改变塔型的带电作业新技术","authors":"Icaro Igor C. De M. Barros, Uilson V. da Silva","doi":"10.1109/ICOLIM.2014.6934378","DOIUrl":null,"url":null,"abstract":"This article presents the live-line work technique, which has been developed to change the type of a tower from suspension to tension. It was necessary to allow the sectioning of the 138 kV Overhead Power Distribution Line. This allows to power a new industrial consumer in a new double circuit, without interruption of the supply of an industrial customer already in operation connected to the 138 kV Overhead Power Distribution Line. Stages of planning and implementation are detailed in this article, with particular attention to the adopted safety measures adopted for the successful development of the activity.","PeriodicalId":238060,"journal":{"name":"2014 11th International Conference on Live Maintenance (ICOLIM)","volume":"236 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Supplying power to a new industrial consumer a new work technique in live-line developed to change the type of towers\",\"authors\":\"Icaro Igor C. De M. Barros, Uilson V. da Silva\",\"doi\":\"10.1109/ICOLIM.2014.6934378\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents the live-line work technique, which has been developed to change the type of a tower from suspension to tension. It was necessary to allow the sectioning of the 138 kV Overhead Power Distribution Line. This allows to power a new industrial consumer in a new double circuit, without interruption of the supply of an industrial customer already in operation connected to the 138 kV Overhead Power Distribution Line. Stages of planning and implementation are detailed in this article, with particular attention to the adopted safety measures adopted for the successful development of the activity.\",\"PeriodicalId\":238060,\"journal\":{\"name\":\"2014 11th International Conference on Live Maintenance (ICOLIM)\",\"volume\":\"236 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 11th International Conference on Live Maintenance (ICOLIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICOLIM.2014.6934378\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Live Maintenance (ICOLIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOLIM.2014.6934378","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Supplying power to a new industrial consumer a new work technique in live-line developed to change the type of towers
This article presents the live-line work technique, which has been developed to change the type of a tower from suspension to tension. It was necessary to allow the sectioning of the 138 kV Overhead Power Distribution Line. This allows to power a new industrial consumer in a new double circuit, without interruption of the supply of an industrial customer already in operation connected to the 138 kV Overhead Power Distribution Line. Stages of planning and implementation are detailed in this article, with particular attention to the adopted safety measures adopted for the successful development of the activity.