{"title":"一个金融计算机操作中心的可靠性程序","authors":"A. H. Ralston","doi":"10.1109/ARMS.1989.49628","DOIUrl":null,"url":null,"abstract":"A reliability program was conducted for the various electrical, HVAC, and mechanical services in support of the development of a new major computer operations center for Shearson Lehman Hutton. The program included: detailed risk analysis involving the architect, the design engineers, the construction managers, specialty consultants, and Shearson's engineering and computer user groups; correction of potential faults in design, construction, and operating procedures; factory and construction testing; preparation of special operating manuals; and annual reliability audits. A case history demonstrates reliable operation over a period of 1-1/2 years with no computer downtime.<<ETX>>","PeriodicalId":430861,"journal":{"name":"Proceedings., Annual Reliability and Maintainability Symposium","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1989-01-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reliability program for a financial computer-operations center\",\"authors\":\"A. H. Ralston\",\"doi\":\"10.1109/ARMS.1989.49628\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A reliability program was conducted for the various electrical, HVAC, and mechanical services in support of the development of a new major computer operations center for Shearson Lehman Hutton. The program included: detailed risk analysis involving the architect, the design engineers, the construction managers, specialty consultants, and Shearson's engineering and computer user groups; correction of potential faults in design, construction, and operating procedures; factory and construction testing; preparation of special operating manuals; and annual reliability audits. A case history demonstrates reliable operation over a period of 1-1/2 years with no computer downtime.<<ETX>>\",\"PeriodicalId\":430861,\"journal\":{\"name\":\"Proceedings., Annual Reliability and Maintainability Symposium\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1989-01-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings., Annual Reliability and Maintainability Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ARMS.1989.49628\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings., Annual Reliability and Maintainability Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ARMS.1989.49628","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Reliability program for a financial computer-operations center
A reliability program was conducted for the various electrical, HVAC, and mechanical services in support of the development of a new major computer operations center for Shearson Lehman Hutton. The program included: detailed risk analysis involving the architect, the design engineers, the construction managers, specialty consultants, and Shearson's engineering and computer user groups; correction of potential faults in design, construction, and operating procedures; factory and construction testing; preparation of special operating manuals; and annual reliability audits. A case history demonstrates reliable operation over a period of 1-1/2 years with no computer downtime.<>