Zihui Guo, Jun Wu, Wenshan Xiao, Yihui Chen, Wenxin Huang, Zichen Liu
{"title":"基于接入风险的工业大用户接入规划方法","authors":"Zihui Guo, Jun Wu, Wenshan Xiao, Yihui Chen, Wenxin Huang, Zichen Liu","doi":"10.1117/12.2689368","DOIUrl":null,"url":null,"abstract":"In the environment of high speed development of large user industries, in order to ensure safe and reliable access to the grid for industrial large users, this paper proposes an industrial large user access planning model based on access risk. First, the traditional economic and security indicators are replaced by risk indicators, and the risk indicator system is constructed by considering the uncertainty of large user access capacity. Then, the CRITIC method is used to assign weights to the indicators of comprehensive risk, and the artificial bee colony algorithm is used to find the optimal access node as the target, so as to complete the site selection and access work of industrial large users. Finally, the effectiveness of the proposed method is verified by using the IEEE-69 node system as an example.","PeriodicalId":118234,"journal":{"name":"4th International Conference on Information Science, Electrical and Automation Engineering","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Access planning method for industrial large users based on access risk\",\"authors\":\"Zihui Guo, Jun Wu, Wenshan Xiao, Yihui Chen, Wenxin Huang, Zichen Liu\",\"doi\":\"10.1117/12.2689368\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the environment of high speed development of large user industries, in order to ensure safe and reliable access to the grid for industrial large users, this paper proposes an industrial large user access planning model based on access risk. First, the traditional economic and security indicators are replaced by risk indicators, and the risk indicator system is constructed by considering the uncertainty of large user access capacity. Then, the CRITIC method is used to assign weights to the indicators of comprehensive risk, and the artificial bee colony algorithm is used to find the optimal access node as the target, so as to complete the site selection and access work of industrial large users. Finally, the effectiveness of the proposed method is verified by using the IEEE-69 node system as an example.\",\"PeriodicalId\":118234,\"journal\":{\"name\":\"4th International Conference on Information Science, Electrical and Automation Engineering\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"4th International Conference on Information Science, Electrical and Automation Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.2689368\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"4th International Conference on Information Science, Electrical and Automation Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2689368","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Access planning method for industrial large users based on access risk
In the environment of high speed development of large user industries, in order to ensure safe and reliable access to the grid for industrial large users, this paper proposes an industrial large user access planning model based on access risk. First, the traditional economic and security indicators are replaced by risk indicators, and the risk indicator system is constructed by considering the uncertainty of large user access capacity. Then, the CRITIC method is used to assign weights to the indicators of comprehensive risk, and the artificial bee colony algorithm is used to find the optimal access node as the target, so as to complete the site selection and access work of industrial large users. Finally, the effectiveness of the proposed method is verified by using the IEEE-69 node system as an example.