{"title":"钢夹作为钢筋混凝土损伤柱的快速加固方法","authors":"Y. Klymenko, E.V. Maksiuta","doi":"10.31650/2707-3068-2022-26-115-127","DOIUrl":null,"url":null,"abstract":"Based on the field studies and determination of the parameters of the stress-strain state, as well as the nature of the operation of reinforced concrete I-beam columns damaged during operation and during hostilities, a general method for determining the residual bearing capacity of elements was created.","PeriodicalId":365885,"journal":{"name":"Modern structures of metal and wood","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"STEEL CLAMP AS EXPRESS METHOD OF REINFORCEMENT OF REINFORCED CONCRETE DAMAGED COLUMNS\",\"authors\":\"Y. Klymenko, E.V. Maksiuta\",\"doi\":\"10.31650/2707-3068-2022-26-115-127\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on the field studies and determination of the parameters of the stress-strain state, as well as the nature of the operation of reinforced concrete I-beam columns damaged during operation and during hostilities, a general method for determining the residual bearing capacity of elements was created.\",\"PeriodicalId\":365885,\"journal\":{\"name\":\"Modern structures of metal and wood\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Modern structures of metal and wood\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31650/2707-3068-2022-26-115-127\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modern structures of metal and wood","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31650/2707-3068-2022-26-115-127","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
STEEL CLAMP AS EXPRESS METHOD OF REINFORCEMENT OF REINFORCED CONCRETE DAMAGED COLUMNS
Based on the field studies and determination of the parameters of the stress-strain state, as well as the nature of the operation of reinforced concrete I-beam columns damaged during operation and during hostilities, a general method for determining the residual bearing capacity of elements was created.