{"title":"第八条:交货延期和延期(不可抗力)","authors":"S. Curtis, I. Gaunt, W. Cecil","doi":"10.4324/9780429428166-12","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":265797,"journal":{"name":"The Law of Shipbuilding Contracts","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Article VIII—Delays and Extension of Time for Delivery ( Force Majeure)\",\"authors\":\"S. Curtis, I. Gaunt, W. Cecil\",\"doi\":\"10.4324/9780429428166-12\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":265797,\"journal\":{\"name\":\"The Law of Shipbuilding Contracts\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-04-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Law of Shipbuilding Contracts\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4324/9780429428166-12\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Law of Shipbuilding Contracts","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9780429428166-12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}