Qiran Zhang, Mengyao Yang, Xiaoyang Liu, Jiaye Wang
{"title":"用聚类分析解决移动通信网络站点规划问题","authors":"Qiran Zhang, Mengyao Yang, Xiaoyang Liu, Jiaye Wang","doi":"10.54691/fsd.v3i2.3982","DOIUrl":null,"url":null,"abstract":"The area planning problem involves optimization model and clustering model, according to the site construction requirements, the base station planning needs to cover 90% of the business volume in the weak coverage area. In the process of site selection, it is required that the cost is as low as possible and the constraints of each condition are satisfied. Therefore, according to different site construction conditions, two corresponding planning schemes and a clustering method are derived.","PeriodicalId":427767,"journal":{"name":"Frontiers in Sustainable Development","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Using Cluster Analysis to Solve Mobile Communication Network Site Planning Problems\",\"authors\":\"Qiran Zhang, Mengyao Yang, Xiaoyang Liu, Jiaye Wang\",\"doi\":\"10.54691/fsd.v3i2.3982\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The area planning problem involves optimization model and clustering model, according to the site construction requirements, the base station planning needs to cover 90% of the business volume in the weak coverage area. In the process of site selection, it is required that the cost is as low as possible and the constraints of each condition are satisfied. Therefore, according to different site construction conditions, two corresponding planning schemes and a clustering method are derived.\",\"PeriodicalId\":427767,\"journal\":{\"name\":\"Frontiers in Sustainable Development\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Frontiers in Sustainable Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54691/fsd.v3i2.3982\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Frontiers in Sustainable Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54691/fsd.v3i2.3982","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Using Cluster Analysis to Solve Mobile Communication Network Site Planning Problems
The area planning problem involves optimization model and clustering model, according to the site construction requirements, the base station planning needs to cover 90% of the business volume in the weak coverage area. In the process of site selection, it is required that the cost is as low as possible and the constraints of each condition are satisfied. Therefore, according to different site construction conditions, two corresponding planning schemes and a clustering method are derived.