服务零件供应链的动态优先维修策略

A. Rezaei Somarin, Sobhan Asian, S. Chen
{"title":"服务零件供应链的动态优先维修策略","authors":"A. Rezaei Somarin, Sobhan Asian, S. Chen","doi":"10.1109/IEEM.2016.7797986","DOIUrl":null,"url":null,"abstract":"We study a repairable service parts inventory system with a central repair facility and several inventory holding locations. In case of a part failure, the failed part is identified and replaced with a ready-to-use part. Afterwards, the failed part is sent to the repair facility, where it is repaired and allocated to one of the bases. The objective is to identify the base with the most urgent need of a service part in order to minimize the expected backorder cost. To this aim, we investigate the initial base-stock provisioning problem in conjunction with the real time stock allocation decision making. We propose a heuristic technique for stock allocation based on relative value function and average backorder cost. We compare the performance of the heuristic model against the myopic policy to validate the efficiency of our proposed mechanism. Results reveal that the proposed stock allocation policy outperforms the myopic policy.","PeriodicalId":114906,"journal":{"name":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Dynamic priority repair policy for service parts supply chain\",\"authors\":\"A. Rezaei Somarin, Sobhan Asian, S. Chen\",\"doi\":\"10.1109/IEEM.2016.7797986\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We study a repairable service parts inventory system with a central repair facility and several inventory holding locations. In case of a part failure, the failed part is identified and replaced with a ready-to-use part. Afterwards, the failed part is sent to the repair facility, where it is repaired and allocated to one of the bases. The objective is to identify the base with the most urgent need of a service part in order to minimize the expected backorder cost. To this aim, we investigate the initial base-stock provisioning problem in conjunction with the real time stock allocation decision making. We propose a heuristic technique for stock allocation based on relative value function and average backorder cost. We compare the performance of the heuristic model against the myopic policy to validate the efficiency of our proposed mechanism. Results reveal that the proposed stock allocation policy outperforms the myopic policy.\",\"PeriodicalId\":114906,\"journal\":{\"name\":\"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"30 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2016.7797986\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2016.7797986","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

我们研究了一个具有中心维修设施和多个库存存放点的可修理服务零件库存系统。在零件失效的情况下,失效的零件被识别并替换为现成的零件。之后,故障部件被送到维修设施,在那里进行维修并分配到其中一个基地。目标是确定最迫切需要服务部件的基地,以最大限度地减少预期的缺货成本。为此,我们结合实时库存分配决策来研究初始基本库存供应问题。提出了一种基于相对价值函数和平均缺货成本的启发式库存分配方法。我们将启发式模型的性能与近视策略进行比较,以验证我们提出的机制的效率。结果表明,本文提出的股票配置策略优于短视策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Dynamic priority repair policy for service parts supply chain
We study a repairable service parts inventory system with a central repair facility and several inventory holding locations. In case of a part failure, the failed part is identified and replaced with a ready-to-use part. Afterwards, the failed part is sent to the repair facility, where it is repaired and allocated to one of the bases. The objective is to identify the base with the most urgent need of a service part in order to minimize the expected backorder cost. To this aim, we investigate the initial base-stock provisioning problem in conjunction with the real time stock allocation decision making. We propose a heuristic technique for stock allocation based on relative value function and average backorder cost. We compare the performance of the heuristic model against the myopic policy to validate the efficiency of our proposed mechanism. Results reveal that the proposed stock allocation policy outperforms the myopic policy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信