电力系统恢复中减小驻相角的新方法

K. Ketabi, A. Ranjbar
{"title":"电力系统恢复中减小驻相角的新方法","authors":"K. Ketabi, A. Ranjbar","doi":"10.1109/PTC.1999.826509","DOIUrl":null,"url":null,"abstract":"The paper describes a methodology for the reduction of standing phase angle (SPA) difference between two buses during restoration operations of a power system. These angles may occur across a tie line, between two systems or between two connected subsystems within a system which may causes significant delay in power system restoration. They must be within SPA limits before an attempt is made to close breakers to firm up the bulk power transmission system. To arrive at the desired SPA difference between two buses, the modified contribution at generation/load buses have been evaluated based on sensitivity factors. This methodology acts as a direct help to reduce excessive SPA difference between two buses to an acceptable limit, which otherwise requires regulation of various generation levels on a trial and error basis.","PeriodicalId":101688,"journal":{"name":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":"{\"title\":\"New approach to standing phase angle reduction for power system restoration\",\"authors\":\"K. Ketabi, A. Ranjbar\",\"doi\":\"10.1109/PTC.1999.826509\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper describes a methodology for the reduction of standing phase angle (SPA) difference between two buses during restoration operations of a power system. These angles may occur across a tie line, between two systems or between two connected subsystems within a system which may causes significant delay in power system restoration. They must be within SPA limits before an attempt is made to close breakers to firm up the bulk power transmission system. To arrive at the desired SPA difference between two buses, the modified contribution at generation/load buses have been evaluated based on sensitivity factors. This methodology acts as a direct help to reduce excessive SPA difference between two buses to an acceptable limit, which otherwise requires regulation of various generation levels on a trial and error basis.\",\"PeriodicalId\":101688,\"journal\":{\"name\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"20\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.1999.826509\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.1999.826509","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 20

摘要

本文介绍了一种在电力系统恢复运行中减小双母线驻相角差的方法。这些角度可能发生在连接线上、两个系统之间或系统内两个相连的子系统之间,这可能会导致电力系统恢复的严重延迟。在试图关闭断路器以稳固大容量电力传输系统之前,它们必须在SPA限制内。为了达到两个母线之间期望的SPA差异,根据敏感性因素对发电/负载母线的修改贡献进行了评估。这种方法可以直接帮助将两个总线之间的SPA差异减少到可接受的限度,否则就需要在试验和错误的基础上对各种发电水平进行调节。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
New approach to standing phase angle reduction for power system restoration
The paper describes a methodology for the reduction of standing phase angle (SPA) difference between two buses during restoration operations of a power system. These angles may occur across a tie line, between two systems or between two connected subsystems within a system which may causes significant delay in power system restoration. They must be within SPA limits before an attempt is made to close breakers to firm up the bulk power transmission system. To arrive at the desired SPA difference between two buses, the modified contribution at generation/load buses have been evaluated based on sensitivity factors. This methodology acts as a direct help to reduce excessive SPA difference between two buses to an acceptable limit, which otherwise requires regulation of various generation levels on a trial and error basis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信