Mengchao Ma, Yongbin Bao, Lei Wang, W. Nie, Yidong Zhang, Yang Li
{"title":"10kV母线PT击穿事故分析与对策","authors":"Mengchao Ma, Yongbin Bao, Lei Wang, W. Nie, Yidong Zhang, Yang Li","doi":"10.1109/ICPDS47662.2019.9017180","DOIUrl":null,"url":null,"abstract":"A 10kV bus PT breakdown accident caused by two-phase grounded is mainly introduced in this paper. Firstly, the bus voltage variation is analyzed when two-phase grounded occurs. Then, the ferromagnetic resonance mechanism and the reason of PT magnetic saturation are introduced in neutral point ungrounded system. The function of PT primary side resonance elimination device is analyzed. At last, the management and technology problem exposed by the accident is analyzed, and the preventive measures suitable for the company are put forward in order to reduce the occurrence of such accidents.","PeriodicalId":130202,"journal":{"name":"2019 IEEE International Conference on Power Data Science (ICPDS)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis and Measures of 10kV Bus PT Breakdown Accident\",\"authors\":\"Mengchao Ma, Yongbin Bao, Lei Wang, W. Nie, Yidong Zhang, Yang Li\",\"doi\":\"10.1109/ICPDS47662.2019.9017180\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A 10kV bus PT breakdown accident caused by two-phase grounded is mainly introduced in this paper. Firstly, the bus voltage variation is analyzed when two-phase grounded occurs. Then, the ferromagnetic resonance mechanism and the reason of PT magnetic saturation are introduced in neutral point ungrounded system. The function of PT primary side resonance elimination device is analyzed. At last, the management and technology problem exposed by the accident is analyzed, and the preventive measures suitable for the company are put forward in order to reduce the occurrence of such accidents.\",\"PeriodicalId\":130202,\"journal\":{\"name\":\"2019 IEEE International Conference on Power Data Science (ICPDS)\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE International Conference on Power Data Science (ICPDS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPDS47662.2019.9017180\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Power Data Science (ICPDS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPDS47662.2019.9017180","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analysis and Measures of 10kV Bus PT Breakdown Accident
A 10kV bus PT breakdown accident caused by two-phase grounded is mainly introduced in this paper. Firstly, the bus voltage variation is analyzed when two-phase grounded occurs. Then, the ferromagnetic resonance mechanism and the reason of PT magnetic saturation are introduced in neutral point ungrounded system. The function of PT primary side resonance elimination device is analyzed. At last, the management and technology problem exposed by the accident is analyzed, and the preventive measures suitable for the company are put forward in order to reduce the occurrence of such accidents.