{"title":"考虑测试工作量和变更点变化的软件可靠性分析","authors":"Syuan-Zao Ke, Chin-Yu Huang, K. Peng","doi":"10.1145/2666581.2666588","DOIUrl":null,"url":null,"abstract":"It is commonly recognized that software development is highly unpredictable and software quality may not be easily enhanced after software product is finished. During the software development life cycle (SDLC), project managers have to solve many technical and management issues, such as high failure rate, cost over-run, low quality, late delivery, etc. Consequently, in order to produce robust and reliable software product(s) on time and within budget, project managers and developers have to appropriately allocate limited development- and testing-effort and time. In the past, the distribution of testing-effort or manpower can typically be described by the Weibull or Rayleigh model. Practically, it should be noticed that development environments or methods could change due to some reasons. Thus when we plan to perform software reliability modeling and prediction, these changes or variations occurring in the development process have to be taken into consideration. In this paper, we will study how to use the Parr-curve model with multiple change-points to depict the consumption of testing-effort and how to perform further software reliability analysis. The applicability and performance of our proposed model will be demonstrated and assessed through real software failure data. Experimental results are analyzed and compared with other existing models to show that our proposed model gives better predictions.","PeriodicalId":249136,"journal":{"name":"Proceedings of the International Workshop on Innovative Software Development Methodologies and Practices","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Software reliability analysis considering the variation of testing-effort and change-point\",\"authors\":\"Syuan-Zao Ke, Chin-Yu Huang, K. Peng\",\"doi\":\"10.1145/2666581.2666588\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is commonly recognized that software development is highly unpredictable and software quality may not be easily enhanced after software product is finished. During the software development life cycle (SDLC), project managers have to solve many technical and management issues, such as high failure rate, cost over-run, low quality, late delivery, etc. Consequently, in order to produce robust and reliable software product(s) on time and within budget, project managers and developers have to appropriately allocate limited development- and testing-effort and time. In the past, the distribution of testing-effort or manpower can typically be described by the Weibull or Rayleigh model. Practically, it should be noticed that development environments or methods could change due to some reasons. Thus when we plan to perform software reliability modeling and prediction, these changes or variations occurring in the development process have to be taken into consideration. In this paper, we will study how to use the Parr-curve model with multiple change-points to depict the consumption of testing-effort and how to perform further software reliability analysis. The applicability and performance of our proposed model will be demonstrated and assessed through real software failure data. Experimental results are analyzed and compared with other existing models to show that our proposed model gives better predictions.\",\"PeriodicalId\":249136,\"journal\":{\"name\":\"Proceedings of the International Workshop on Innovative Software Development Methodologies and Practices\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-11-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the International Workshop on Innovative Software Development Methodologies and Practices\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/2666581.2666588\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the International Workshop on Innovative Software Development Methodologies and Practices","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/2666581.2666588","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

人们普遍认为,软件开发是高度不可预测的,软件产品完成后,软件质量可能不容易提高。在软件开发生命周期(SDLC)中,项目经理必须解决许多技术和管理问题,例如高故障率、成本超支、低质量、延迟交付等。因此,为了在预算内按时生产健壮可靠的软件产品,项目经理和开发人员必须适当地分配有限的开发和测试工作和时间。在过去,测试工作或人力的分配通常可以用Weibull或Rayleigh模型来描述。实际上,应该注意到开发环境或方法可能由于某些原因而发生变化。因此,当我们计划执行软件可靠性建模和预测时,必须考虑到开发过程中发生的这些更改或变化。在本文中,我们将研究如何使用具有多个变更点的parr曲线模型来描述测试工作的消耗以及如何进行进一步的软件可靠性分析。我们提出的模型的适用性和性能将通过实际的软件故障数据进行论证和评估。实验结果表明,本文提出的模型具有较好的预测效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Software reliability analysis considering the variation of testing-effort and change-point
It is commonly recognized that software development is highly unpredictable and software quality may not be easily enhanced after software product is finished. During the software development life cycle (SDLC), project managers have to solve many technical and management issues, such as high failure rate, cost over-run, low quality, late delivery, etc. Consequently, in order to produce robust and reliable software product(s) on time and within budget, project managers and developers have to appropriately allocate limited development- and testing-effort and time. In the past, the distribution of testing-effort or manpower can typically be described by the Weibull or Rayleigh model. Practically, it should be noticed that development environments or methods could change due to some reasons. Thus when we plan to perform software reliability modeling and prediction, these changes or variations occurring in the development process have to be taken into consideration. In this paper, we will study how to use the Parr-curve model with multiple change-points to depict the consumption of testing-effort and how to perform further software reliability analysis. The applicability and performance of our proposed model will be demonstrated and assessed through real software failure data. Experimental results are analyzed and compared with other existing models to show that our proposed model gives better predictions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信