突发情况下负荷传输网络并行化技术可行性分析

M. S. Ortiz, D. Bernardon, M. Wolter, Émerson Rafael da Silva, L. L. Pfitscher, W. Hokama
{"title":"突发情况下负荷传输网络并行化技术可行性分析","authors":"M. S. Ortiz, D. Bernardon, M. Wolter, Émerson Rafael da Silva, L. L. Pfitscher, W. Hokama","doi":"10.1109/TDC-LA.2018.8511760","DOIUrl":null,"url":null,"abstract":"Electricity suppliers have increasingly invested in technology solutions, especially in the automation area, to improve the electricity supply to their consumers. In contingency situations, the process of restoring the electric energy consists of identifying and isolating the fault, quickly restoring the power supply to unaffected areas, according to the reconfiguration of the network through the opening or closing of the maneuver equipment. After fault correction, new maneuvers are performed to return to the normal state of the networks. Hence, the reactive characteristics of network elements such as line inductances and the loads of capacitor banks, can originate undesirable electromagnetic transients during the switching maneuvers. Therefore, this paper aims to present the development of a methodology for the analysis of the technical viability of parallelism in the distribution networks with capacitor banks for the reestablishment of electric energy, considering the cascade of loads between the network feeders. The proposed study is, therefore, a particularity of the distribution systems and the validation of the operational feasibility of the maneuvers will be verified from computational simulations performed with the ATPDraw software.","PeriodicalId":267301,"journal":{"name":"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Analysis of the Technical Feasibility of Network Parallelism for Load Transfers in Contingency Situations\",\"authors\":\"M. S. Ortiz, D. Bernardon, M. Wolter, Émerson Rafael da Silva, L. L. Pfitscher, W. Hokama\",\"doi\":\"10.1109/TDC-LA.2018.8511760\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Electricity suppliers have increasingly invested in technology solutions, especially in the automation area, to improve the electricity supply to their consumers. In contingency situations, the process of restoring the electric energy consists of identifying and isolating the fault, quickly restoring the power supply to unaffected areas, according to the reconfiguration of the network through the opening or closing of the maneuver equipment. After fault correction, new maneuvers are performed to return to the normal state of the networks. Hence, the reactive characteristics of network elements such as line inductances and the loads of capacitor banks, can originate undesirable electromagnetic transients during the switching maneuvers. Therefore, this paper aims to present the development of a methodology for the analysis of the technical viability of parallelism in the distribution networks with capacitor banks for the reestablishment of electric energy, considering the cascade of loads between the network feeders. The proposed study is, therefore, a particularity of the distribution systems and the validation of the operational feasibility of the maneuvers will be verified from computational simulations performed with the ATPDraw software.\",\"PeriodicalId\":267301,\"journal\":{\"name\":\"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC-LA.2018.8511760\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2018.8511760","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

电力供应商越来越多地投资于技术解决方案,特别是在自动化领域,以改善对消费者的电力供应。在紧急情况下,恢复电能的过程包括识别和隔离故障,根据电网的重新配置,通过打开或关闭机动设备,迅速恢复未受影响地区的供电。故障恢复后,执行新的操作使网络恢复到正常状态。因此,网络单元的无功特性,如线路电感和电容器组负载,会在开关操作期间产生不良的电磁瞬变。因此,本文旨在介绍一种方法的发展,用于分析配电网络中并联电容器组用于重建电能的技术可行性,考虑到网络馈线之间的级联负载。因此,所提出的研究是分配系统的特殊性,演习的操作可行性验证将通过使用ATPDraw软件进行的计算模拟来验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of the Technical Feasibility of Network Parallelism for Load Transfers in Contingency Situations
Electricity suppliers have increasingly invested in technology solutions, especially in the automation area, to improve the electricity supply to their consumers. In contingency situations, the process of restoring the electric energy consists of identifying and isolating the fault, quickly restoring the power supply to unaffected areas, according to the reconfiguration of the network through the opening or closing of the maneuver equipment. After fault correction, new maneuvers are performed to return to the normal state of the networks. Hence, the reactive characteristics of network elements such as line inductances and the loads of capacitor banks, can originate undesirable electromagnetic transients during the switching maneuvers. Therefore, this paper aims to present the development of a methodology for the analysis of the technical viability of parallelism in the distribution networks with capacitor banks for the reestablishment of electric energy, considering the cascade of loads between the network feeders. The proposed study is, therefore, a particularity of the distribution systems and the validation of the operational feasibility of the maneuvers will be verified from computational simulations performed with the ATPDraw software.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信