{"title":"敖德萨地区含水饱和土中地下构筑物地基基础部分的安装","authors":"G. Plahotny, O. Chernieva, L. Chorna","doi":"10.23939/jtbp2021.01.001","DOIUrl":null,"url":null,"abstract":"According to the General Plan of the city's perspective development, it is planned to develop the territories of the irrigation fields and the adjoining dam. The article details the engineering tasks of erecting the foundation-basement construction of underground structures considering the geological and hydrogeological conditions of the low-lying area of the Odessa region. Features of occurrence and genesis of low-lying part sites have been elaborated. The paper also elucidates the methods of orientation employed and water lowering during the erection of underground structures. Technological order of work execution for reliable and effective structural scheme of underground structures in water-saturated soils is proposed. A device for vertical waterproofing of external walls and horizontal waterproofing of the floor of an underground structure has been developed.","PeriodicalId":369033,"journal":{"name":"Theory and Building Practice","volume":"306 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ERECTION OF FOUNDATION-BASEMENT PART OF UNDERGROUND STRUCTURES IN WATER-SATURATED SOILS OF ODESSA REGION\",\"authors\":\"G. Plahotny, O. Chernieva, L. Chorna\",\"doi\":\"10.23939/jtbp2021.01.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"According to the General Plan of the city's perspective development, it is planned to develop the territories of the irrigation fields and the adjoining dam. The article details the engineering tasks of erecting the foundation-basement construction of underground structures considering the geological and hydrogeological conditions of the low-lying area of the Odessa region. Features of occurrence and genesis of low-lying part sites have been elaborated. The paper also elucidates the methods of orientation employed and water lowering during the erection of underground structures. Technological order of work execution for reliable and effective structural scheme of underground structures in water-saturated soils is proposed. A device for vertical waterproofing of external walls and horizontal waterproofing of the floor of an underground structure has been developed.\",\"PeriodicalId\":369033,\"journal\":{\"name\":\"Theory and Building Practice\",\"volume\":\"306 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Theory and Building Practice\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23939/jtbp2021.01.001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Theory and Building Practice","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23939/jtbp2021.01.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

根据城市远景发展总体规划,规划对灌溉区及毗邻坝区进行开发。本文结合敖德萨地区低洼地区的地质和水文地质条件,详细介绍了地下构筑物基础-地下室施工的工程任务。阐述了低洼地区遗址的发生和成因特点。文中还阐述了地下构筑物架设过程中定位和降水的方法。提出了饱和水土壤中地下结构可靠有效的结构方案的施工技术顺序。研制了一种用于地下结构外墙垂直防水和楼板水平防水的装置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ERECTION OF FOUNDATION-BASEMENT PART OF UNDERGROUND STRUCTURES IN WATER-SATURATED SOILS OF ODESSA REGION
According to the General Plan of the city's perspective development, it is planned to develop the territories of the irrigation fields and the adjoining dam. The article details the engineering tasks of erecting the foundation-basement construction of underground structures considering the geological and hydrogeological conditions of the low-lying area of the Odessa region. Features of occurrence and genesis of low-lying part sites have been elaborated. The paper also elucidates the methods of orientation employed and water lowering during the erection of underground structures. Technological order of work execution for reliable and effective structural scheme of underground structures in water-saturated soils is proposed. A device for vertical waterproofing of external walls and horizontal waterproofing of the floor of an underground structure has been developed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信