{"title":"掺合料对B-1混凝土工程坍落度减小和混凝土抗压强度的影响","authors":"B. S. Budi, S. ., E. Suhartono, M. -, Sukoyo -, Bintang -, Sakdiyah -","doi":"10.5296/emsd.v8i4.15337","DOIUrl":null,"url":null,"abstract":"Semarang - Solo Toll Road is part of the Trans Java highway, which has a strategic meaning in the development of road networks, specifically in Central Java and also on a regional scale. The construction project generally consists of excavation work, stockpiles and bridge work. The number of work in the project therefore allows the emergence of a problem that can hinder the development process and one of which was related to concrete casting in the construction of the Kali Putih Bridge 1, where there was a slump decrease in columns P1 and P3 concrete pre-casting (30 Mpa). However, a slump test was carried out on column P1 in STA. 61 + 368,500, and P3 in STA. 61 + 293,500, which resulted in 3.5 cm and 4 cm collapse respectively. Hence, they did not meet specification on B-1 concrete, which was 7.5 ± 2.5 cm. In addition, Superplasticizer was used to overcome this problem, as it was capable of restoring freshness/workability. This study, therefore, aimed to determine the effect of the incorporating superplasticizer and retarder into concrete, on its compressive strength, slump decrease, and time, utilizing 24 test cylindrical specimens (7-days and 14-days), through pressure testing. Furthermore, the slump testing was conducted every 20 minutes for 120 minutes, to determine the reduction time, and the findings further indicated that adding a retarder to class B-1 concrete was capable of increasing the functional period (67 minutes on a slump of 7 ± 2.5 cm). However, the addition of Superplasticizer was also able to repair the slumps, which did not meet the requirements, including the specimen that involved the incorporation of a retarder (82.5 minutes, which resulted in a 1.9 cm slump that was further increased to 17.5 cm after augmentation. Furthermore, these effects were due to its ability to reduce the compressive strength by 3.13% and 6.14% on the 7-days and 14-day specimens, respectively. However, the SPSS v.23.0 test results showed the difference in compressive strength between the normal concrete + retarder and normal concrete + retarder + SP, with a sig value of 0.021","PeriodicalId":408586,"journal":{"name":"Environmental Management and Sustainable Development","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Effects of Admixtures Addition on Slump Decrease and Concrete Compressive Strength at B-1 Concrete Works\",\"authors\":\"B. S. Budi, S. ., E. Suhartono, M. -, Sukoyo -, Bintang -, Sakdiyah -\",\"doi\":\"10.5296/emsd.v8i4.15337\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Semarang - Solo Toll Road is part of the Trans Java highway, which has a strategic meaning in the development of road networks, specifically in Central Java and also on a regional scale. The construction project generally consists of excavation work, stockpiles and bridge work. The number of work in the project therefore allows the emergence of a problem that can hinder the development process and one of which was related to concrete casting in the construction of the Kali Putih Bridge 1, where there was a slump decrease in columns P1 and P3 concrete pre-casting (30 Mpa). However, a slump test was carried out on column P1 in STA. 61 + 368,500, and P3 in STA. 61 + 293,500, which resulted in 3.5 cm and 4 cm collapse respectively. Hence, they did not meet specification on B-1 concrete, which was 7.5 ± 2.5 cm. In addition, Superplasticizer was used to overcome this problem, as it was capable of restoring freshness/workability. This study, therefore, aimed to determine the effect of the incorporating superplasticizer and retarder into concrete, on its compressive strength, slump decrease, and time, utilizing 24 test cylindrical specimens (7-days and 14-days), through pressure testing. Furthermore, the slump testing was conducted every 20 minutes for 120 minutes, to determine the reduction time, and the findings further indicated that adding a retarder to class B-1 concrete was capable of increasing the functional period (67 minutes on a slump of 7 ± 2.5 cm). However, the addition of Superplasticizer was also able to repair the slumps, which did not meet the requirements, including the specimen that involved the incorporation of a retarder (82.5 minutes, which resulted in a 1.9 cm slump that was further increased to 17.5 cm after augmentation. Furthermore, these effects were due to its ability to reduce the compressive strength by 3.13% and 6.14% on the 7-days and 14-day specimens, respectively. However, the SPSS v.23.0 test results showed the difference in compressive strength between the normal concrete + retarder and normal concrete + retarder + SP, with a sig value of 0.021\",\"PeriodicalId\":408586,\"journal\":{\"name\":\"Environmental Management and Sustainable Development\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Environmental Management and Sustainable Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5296/emsd.v8i4.15337\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environmental Management and Sustainable Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5296/emsd.v8i4.15337","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

三宝垄-索罗收费公路是跨爪哇高速公路的一部分,对道路网络的发展具有战略意义,特别是在爪哇中部和区域范围内。建设工程一般由开挖、堆垛和桥梁工程组成。因此,项目中的工作数量可能会出现一个阻碍开发过程的问题,其中一个问题与Kali Putih 1号桥建设中的混凝土浇筑有关,其中P1和P3柱的混凝土浇筑坍落度下降(30 Mpa)。然而,在STA的P1柱上进行了坍落度试验。61 + 368,500, STA中的P3。61 + 293500,分别造成3.5 cm和4 cm的塌陷。因此,它们不符合B-1混凝土的规范,即7.5±2.5 cm。此外,使用高效减水剂来克服这个问题,因为它能够恢复新鲜度/可加工性。因此,本研究旨在通过压力试验,确定掺入高效减水剂和缓凝剂对混凝土抗压强度、坍落度降低和时间的影响,利用24个圆柱形试件(7天和14天)进行试验。在120分钟内,每隔20分钟进行一次坍落度测试,以确定减凝时间,结果进一步表明,在B-1类混凝土中添加缓凝剂能够延长其功能期(坍落度为7±2.5 cm时,功能期为67分钟)。然而,加入高效减水剂也能修复不符合要求的坍落度,包括加入缓凝剂(82.5分钟)的试样,导致坍落度从1.9 cm增加到17.5 cm,增加后进一步增加。此外,这些影响是由于其在7天和14天的试件上分别降低了3.13%和6.14%的抗压强度。但SPSS v.23.0检验结果显示,普通混凝土+缓凝剂与普通混凝土+缓凝剂+ SP抗压强度差异,sig值为0.021
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Effects of Admixtures Addition on Slump Decrease and Concrete Compressive Strength at B-1 Concrete Works
Semarang - Solo Toll Road is part of the Trans Java highway, which has a strategic meaning in the development of road networks, specifically in Central Java and also on a regional scale. The construction project generally consists of excavation work, stockpiles and bridge work. The number of work in the project therefore allows the emergence of a problem that can hinder the development process and one of which was related to concrete casting in the construction of the Kali Putih Bridge 1, where there was a slump decrease in columns P1 and P3 concrete pre-casting (30 Mpa). However, a slump test was carried out on column P1 in STA. 61 + 368,500, and P3 in STA. 61 + 293,500, which resulted in 3.5 cm and 4 cm collapse respectively. Hence, they did not meet specification on B-1 concrete, which was 7.5 ± 2.5 cm. In addition, Superplasticizer was used to overcome this problem, as it was capable of restoring freshness/workability. This study, therefore, aimed to determine the effect of the incorporating superplasticizer and retarder into concrete, on its compressive strength, slump decrease, and time, utilizing 24 test cylindrical specimens (7-days and 14-days), through pressure testing. Furthermore, the slump testing was conducted every 20 minutes for 120 minutes, to determine the reduction time, and the findings further indicated that adding a retarder to class B-1 concrete was capable of increasing the functional period (67 minutes on a slump of 7 ± 2.5 cm). However, the addition of Superplasticizer was also able to repair the slumps, which did not meet the requirements, including the specimen that involved the incorporation of a retarder (82.5 minutes, which resulted in a 1.9 cm slump that was further increased to 17.5 cm after augmentation. Furthermore, these effects were due to its ability to reduce the compressive strength by 3.13% and 6.14% on the 7-days and 14-day specimens, respectively. However, the SPSS v.23.0 test results showed the difference in compressive strength between the normal concrete + retarder and normal concrete + retarder + SP, with a sig value of 0.021
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信