项目调度中多模式时间、成本、质量权衡的帕累托最优前沿

H. Iranmanesh, M. Skandari, M. Allahverdiloo
{"title":"项目调度中多模式时间、成本、质量权衡的帕累托最优前沿","authors":"H. Iranmanesh, M. Skandari, M. Allahverdiloo","doi":"10.5281/ZENODO.1074392","DOIUrl":null,"url":null,"abstract":"Project managers are the ultimate responsible for the\noverall characteristics of a project, i.e. they should deliver the project\non time with minimum cost and with maximum quality. It is vital for\nany manager to decide a trade-off between these conflicting\nobjectives and they will be benefited of any scientific decision\nsupport tool. Our work will try to determine optimal solutions (rather\nthan a single optimal solution) from which the project manager will\nselect his desirable choice to run the project. In this paper, the\nproblem in project scheduling notated as\n(1,T|cpm,disc,mu|curve:quality,time,cost) will be studied. The\nproblem is multi-objective and the purpose is finding the Pareto\noptimal front of time, cost and quality of a project\n(curve:quality,time,cost), whose activities belong to a start to finish\nactivity relationship network (cpm) and they can be done in different\npossible modes (mu) which are non-continuous or discrete (disc), and\neach mode has a different cost, time and quality . The project is\nconstrained to a non-renewable resource i.e. money (1,T). Because\nthe problem is NP-Hard, to solve the problem, a meta-heuristic is\ndeveloped based on a version of genetic algorithm specially adapted\nto solve multi-objective problems namely FastPGA. A sample project\nwith 30 activities is generated and then solved by the proposed\nmethod.","PeriodicalId":224473,"journal":{"name":"World Academy of Science, Engineering and Technology, International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"50","resultStr":"{\"title\":\"Finding Pareto Optimal Front for the Multi- Mode Time, Cost Quality Trade-off in Project Scheduling\",\"authors\":\"H. Iranmanesh, M. Skandari, M. Allahverdiloo\",\"doi\":\"10.5281/ZENODO.1074392\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project managers are the ultimate responsible for the\\noverall characteristics of a project, i.e. they should deliver the project\\non time with minimum cost and with maximum quality. It is vital for\\nany manager to decide a trade-off between these conflicting\\nobjectives and they will be benefited of any scientific decision\\nsupport tool. Our work will try to determine optimal solutions (rather\\nthan a single optimal solution) from which the project manager will\\nselect his desirable choice to run the project. In this paper, the\\nproblem in project scheduling notated as\\n(1,T|cpm,disc,mu|curve:quality,time,cost) will be studied. The\\nproblem is multi-objective and the purpose is finding the Pareto\\noptimal front of time, cost and quality of a project\\n(curve:quality,time,cost), whose activities belong to a start to finish\\nactivity relationship network (cpm) and they can be done in different\\npossible modes (mu) which are non-continuous or discrete (disc), and\\neach mode has a different cost, time and quality . The project is\\nconstrained to a non-renewable resource i.e. money (1,T). Because\\nthe problem is NP-Hard, to solve the problem, a meta-heuristic is\\ndeveloped based on a version of genetic algorithm specially adapted\\nto solve multi-objective problems namely FastPGA. A sample project\\nwith 30 activities is generated and then solved by the proposed\\nmethod.\",\"PeriodicalId\":224473,\"journal\":{\"name\":\"World Academy of Science, Engineering and Technology, International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-04-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"50\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"World Academy of Science, Engineering and Technology, International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5281/ZENODO.1074392\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Academy of Science, Engineering and Technology, International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5281/ZENODO.1074392","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 50

摘要

项目经理对项目的整体特征负有最终责任,也就是说,他们应该以最低的成本和最高的质量交付项目时间。对于任何管理者来说,在这些相互冲突的目标之间做出权衡是至关重要的,他们将受益于任何科学的决策支持工具。我们的工作将尝试确定最优解决方案(而不是单一的最优解决方案),项目经理将从中选择他想要的方案来运行项目。本文研究了以(1,T, |, cpm,disc,mu, |曲线:质量,时间,成本)表示的项目调度问题。问题是多目标的,目的是找到一个项目的时间,成本和质量的Paretooptimal front(曲线:质量,时间,成本),其活动属于一个开始到结束的活动关系网络(cpm),它们可以在不同的可能模式(mu)中完成,这些模式是非连续的或离散的(圆盘),每个模式都有不同的成本,时间和质量。该项目受限于不可再生资源,即资金(1,T)。由于该问题是NP-Hard问题,为了解决该问题,基于一种专门用于解决多目标问题的遗传算法,即FastPGA,开发了一种元启发式算法。生成了一个包含30个活动的示例项目,然后使用所提出的方法进行求解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Finding Pareto Optimal Front for the Multi- Mode Time, Cost Quality Trade-off in Project Scheduling
Project managers are the ultimate responsible for the overall characteristics of a project, i.e. they should deliver the project on time with minimum cost and with maximum quality. It is vital for any manager to decide a trade-off between these conflicting objectives and they will be benefited of any scientific decision support tool. Our work will try to determine optimal solutions (rather than a single optimal solution) from which the project manager will select his desirable choice to run the project. In this paper, the problem in project scheduling notated as (1,T|cpm,disc,mu|curve:quality,time,cost) will be studied. The problem is multi-objective and the purpose is finding the Pareto optimal front of time, cost and quality of a project (curve:quality,time,cost), whose activities belong to a start to finish activity relationship network (cpm) and they can be done in different possible modes (mu) which are non-continuous or discrete (disc), and each mode has a different cost, time and quality . The project is constrained to a non-renewable resource i.e. money (1,T). Because the problem is NP-Hard, to solve the problem, a meta-heuristic is developed based on a version of genetic algorithm specially adapted to solve multi-objective problems namely FastPGA. A sample project with 30 activities is generated and then solved by the proposed method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信