基础设施,规划和时间的支配

T. Marshall, R. Cowell
{"title":"基础设施,规划和时间的支配","authors":"T. Marshall, R. Cowell","doi":"10.1177/0263774X16642768","DOIUrl":null,"url":null,"abstract":"Governments in many countries have sought to accelerate the time taken to make decisions on major infrastructure projects, citing problems of ‘delay’. Despite this, rarely has the time variable been given careful empirical or conceptual attention in decision-making generally, or in infrastructure decision-making specifically. This paper addresses this deficit by analysing decision-making on two categories of major infrastructure in the UK – transport and electricity generation – seeking both to generate better evidence of the changes to decision times in recent decades, and to generate insights from treating time as resource and tracking its (re)allocation. We find that reforms introduced since 2008 have done relatively little to alter overall decision times, but that there are marked and revealing changes to the allocation of time between decision-making stages. While public planning processes have their time frames tightly regulated, aspects led by developers (e.g. pre-application discussion) are not; arranging finance can have a bigger effect on project time frames, and central government retains much flexibility to manage the flow of time. Speed-up reforms are also sectorally uneven in their reach. This indicates how arguments for time discipline falter in the face of infrastructure projects that remain profoundly politicised.","PeriodicalId":232420,"journal":{"name":"Environment and Planning C: Government and Policy","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"25","resultStr":"{\"title\":\"Infrastructure, planning and the command of time\",\"authors\":\"T. Marshall, R. Cowell\",\"doi\":\"10.1177/0263774X16642768\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Governments in many countries have sought to accelerate the time taken to make decisions on major infrastructure projects, citing problems of ‘delay’. Despite this, rarely has the time variable been given careful empirical or conceptual attention in decision-making generally, or in infrastructure decision-making specifically. This paper addresses this deficit by analysing decision-making on two categories of major infrastructure in the UK – transport and electricity generation – seeking both to generate better evidence of the changes to decision times in recent decades, and to generate insights from treating time as resource and tracking its (re)allocation. We find that reforms introduced since 2008 have done relatively little to alter overall decision times, but that there are marked and revealing changes to the allocation of time between decision-making stages. While public planning processes have their time frames tightly regulated, aspects led by developers (e.g. pre-application discussion) are not; arranging finance can have a bigger effect on project time frames, and central government retains much flexibility to manage the flow of time. Speed-up reforms are also sectorally uneven in their reach. This indicates how arguments for time discipline falter in the face of infrastructure projects that remain profoundly politicised.\",\"PeriodicalId\":232420,\"journal\":{\"name\":\"Environment and Planning C: Government and Policy\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"25\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Environment and Planning C: Government and Policy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/0263774X16642768\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environment and Planning C: Government and Policy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/0263774X16642768","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 25

摘要

许多国家的政府都试图缩短重大基础设施项目的决策时间,理由是存在“拖延”问题。尽管如此,在一般决策或具体的基础设施决策中,很少对时间变量给予认真的经验或概念上的注意。本文通过分析英国两类主要基础设施(交通和发电)的决策来解决这一缺陷,力求为近几十年来决策时间的变化提供更好的证据,并从将时间视为资源并跟踪其(再)分配中获得见解。我们发现,自2008年以来引入的改革对改变总体决策时间的作用相对较小,但在决策阶段之间的时间分配方面发生了明显的变化。虽然公共规划程序有严格的时间表,但由发展商主导的方面(例如申请前讨论)却没有;安排资金可以对项目时间框架产生更大的影响,中央政府在管理时间流动方面保留了很大的灵活性。加速改革的范围在各个部门也不均衡。这表明,面对仍然高度政治化的基础设施项目,时间纪律的论点是如何站不住脚的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Infrastructure, planning and the command of time
Governments in many countries have sought to accelerate the time taken to make decisions on major infrastructure projects, citing problems of ‘delay’. Despite this, rarely has the time variable been given careful empirical or conceptual attention in decision-making generally, or in infrastructure decision-making specifically. This paper addresses this deficit by analysing decision-making on two categories of major infrastructure in the UK – transport and electricity generation – seeking both to generate better evidence of the changes to decision times in recent decades, and to generate insights from treating time as resource and tracking its (re)allocation. We find that reforms introduced since 2008 have done relatively little to alter overall decision times, but that there are marked and revealing changes to the allocation of time between decision-making stages. While public planning processes have their time frames tightly regulated, aspects led by developers (e.g. pre-application discussion) are not; arranging finance can have a bigger effect on project time frames, and central government retains much flexibility to manage the flow of time. Speed-up reforms are also sectorally uneven in their reach. This indicates how arguments for time discipline falter in the face of infrastructure projects that remain profoundly politicised.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信