数据中心与UPS交互业务的电费优化

Yan Huang, G. Li, Peng Wang, Fengjia Chang, Jian-Ping Li
{"title":"数据中心与UPS交互业务的电费优化","authors":"Yan Huang, G. Li, Peng Wang, Fengjia Chang, Jian-Ping Li","doi":"10.1109/ICCWAMTIP.2018.8632610","DOIUrl":null,"url":null,"abstract":"Electricity cost is the significant cost of data center, which is consisted of energy charge and demand charge. Existing research mainly focus on energy charge but rarely pay attention to the unnegligible demand charge. In this paper, a two-stage algorithm is proposed to optimize data center interactive services's electricity cost including both energy charge and demand charge. Partial execution and UPS are used to reduce energy consumption and peak power consumption so as to optimize electricity cost while guaranteeing the service quality and response time. UPS battery attributes such as UPS runtime and UPS lifetime are considered to ensure the data center availability.","PeriodicalId":117919,"journal":{"name":"2018 15th International Computer Conference on Wavelet Active Media Technology and Information Processing (ICCWAMTIP)","volume":"343 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Electricy Cost Optimization of Data Center Interactive Services with UPS\",\"authors\":\"Yan Huang, G. Li, Peng Wang, Fengjia Chang, Jian-Ping Li\",\"doi\":\"10.1109/ICCWAMTIP.2018.8632610\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Electricity cost is the significant cost of data center, which is consisted of energy charge and demand charge. Existing research mainly focus on energy charge but rarely pay attention to the unnegligible demand charge. In this paper, a two-stage algorithm is proposed to optimize data center interactive services's electricity cost including both energy charge and demand charge. Partial execution and UPS are used to reduce energy consumption and peak power consumption so as to optimize electricity cost while guaranteeing the service quality and response time. UPS battery attributes such as UPS runtime and UPS lifetime are considered to ensure the data center availability.\",\"PeriodicalId\":117919,\"journal\":{\"name\":\"2018 15th International Computer Conference on Wavelet Active Media Technology and Information Processing (ICCWAMTIP)\",\"volume\":\"343 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 15th International Computer Conference on Wavelet Active Media Technology and Information Processing (ICCWAMTIP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCWAMTIP.2018.8632610\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 15th International Computer Conference on Wavelet Active Media Technology and Information Processing (ICCWAMTIP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCWAMTIP.2018.8632610","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

电力成本是数据中心的重要成本,由能源费用和需求费用组成。现有的研究主要集中在能源费用上,而很少关注不可忽略的需求费用。本文提出了一种两阶段算法来优化数据中心交互服务的电力成本,包括能源费用和需求费用。采用局部执行和UPS,在保证服务质量和响应时间的同时,降低能耗和峰值功耗,优化电力成本。考虑UPS电池属性,如UPS运行时间和UPS寿命,以确保数据中心的可用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Electricy Cost Optimization of Data Center Interactive Services with UPS
Electricity cost is the significant cost of data center, which is consisted of energy charge and demand charge. Existing research mainly focus on energy charge but rarely pay attention to the unnegligible demand charge. In this paper, a two-stage algorithm is proposed to optimize data center interactive services's electricity cost including both energy charge and demand charge. Partial execution and UPS are used to reduce energy consumption and peak power consumption so as to optimize electricity cost while guaranteeing the service quality and response time. UPS battery attributes such as UPS runtime and UPS lifetime are considered to ensure the data center availability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信