{"title":"HRG系统调试中的常见问题","authors":"Michael Pingal, S. Panetta","doi":"10.1109/ICPS.2017.7945121","DOIUrl":null,"url":null,"abstract":"This document discusses some common mistakes that are made in the commissioning of High Resistance Grounding (HRG) systems. While high resistance grounding has been in use for some time, many commissioning teams are less familiar with HRG systems and various issues can arise in the commissioning process. Topics discussed include: compatibility of equipment with HRG systems; how system configuration affects testing and verification; and key points for training programs.","PeriodicalId":111440,"journal":{"name":"2017 Annual Pulp, Paper And Forest Industries Technical Conference (PPFIC)","volume":"69 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Common problems in commissioning of HRG systems\",\"authors\":\"Michael Pingal, S. Panetta\",\"doi\":\"10.1109/ICPS.2017.7945121\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This document discusses some common mistakes that are made in the commissioning of High Resistance Grounding (HRG) systems. While high resistance grounding has been in use for some time, many commissioning teams are less familiar with HRG systems and various issues can arise in the commissioning process. Topics discussed include: compatibility of equipment with HRG systems; how system configuration affects testing and verification; and key points for training programs.\",\"PeriodicalId\":111440,\"journal\":{\"name\":\"2017 Annual Pulp, Paper And Forest Industries Technical Conference (PPFIC)\",\"volume\":\"69 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 Annual Pulp, Paper And Forest Industries Technical Conference (PPFIC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPS.2017.7945121\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 Annual Pulp, Paper And Forest Industries Technical Conference (PPFIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.2017.7945121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This document discusses some common mistakes that are made in the commissioning of High Resistance Grounding (HRG) systems. While high resistance grounding has been in use for some time, many commissioning teams are less familiar with HRG systems and various issues can arise in the commissioning process. Topics discussed include: compatibility of equipment with HRG systems; how system configuration affects testing and verification; and key points for training programs.