在基于CCPM的项目制造环境中设定交货期

Xiabao Huang, L. Yang
{"title":"在基于CCPM的项目制造环境中设定交货期","authors":"Xiabao Huang, L. Yang","doi":"10.1109/ICACIA.2009.5361070","DOIUrl":null,"url":null,"abstract":"To reduce lead-time of a product in the project manufacturing environment while improving on time completion rate, a new approach based on CCPM to setting lead-time is developed. After analyzing the features of project manufacturing, it is concluded that current methods of setting lead-time usually don't perform well for project manufacturing. For the project manufacturing has the same features as a project, incorporated CCPM, a four step approach which involves defining a project, identifying critical chain, setting buffers and constructing the project plan, to set lead-time is proposed. A simulation experiment indicates that the proposed approach outperforms CPM.","PeriodicalId":423210,"journal":{"name":"2009 International Conference on Apperceiving Computing and Intelligence Analysis","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Setting lead-time in project manufacturing environment based on CCPM\",\"authors\":\"Xiabao Huang, L. Yang\",\"doi\":\"10.1109/ICACIA.2009.5361070\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To reduce lead-time of a product in the project manufacturing environment while improving on time completion rate, a new approach based on CCPM to setting lead-time is developed. After analyzing the features of project manufacturing, it is concluded that current methods of setting lead-time usually don't perform well for project manufacturing. For the project manufacturing has the same features as a project, incorporated CCPM, a four step approach which involves defining a project, identifying critical chain, setting buffers and constructing the project plan, to set lead-time is proposed. A simulation experiment indicates that the proposed approach outperforms CPM.\",\"PeriodicalId\":423210,\"journal\":{\"name\":\"2009 International Conference on Apperceiving Computing and Intelligence Analysis\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 International Conference on Apperceiving Computing and Intelligence Analysis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICACIA.2009.5361070\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Apperceiving Computing and Intelligence Analysis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICACIA.2009.5361070","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

为了减少项目制造环境下产品的交货期,同时提高准时成品率,提出了一种基于CCPM的产品交货期设定方法。在分析了项目制造的特点后,得出了现有的交货期设定方法通常不适用于项目制造的结论。针对项目制造与项目具有相同的特点,提出了项目定义、关键链识别、缓冲区设置、项目计划构建、交货期设定的四步方法。仿真实验表明,该方法优于CPM方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Setting lead-time in project manufacturing environment based on CCPM
To reduce lead-time of a product in the project manufacturing environment while improving on time completion rate, a new approach based on CCPM to setting lead-time is developed. After analyzing the features of project manufacturing, it is concluded that current methods of setting lead-time usually don't perform well for project manufacturing. For the project manufacturing has the same features as a project, incorporated CCPM, a four step approach which involves defining a project, identifying critical chain, setting buffers and constructing the project plan, to set lead-time is proposed. A simulation experiment indicates that the proposed approach outperforms CPM.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信