西线一切平静?北欧电力市场的输电能力发展

M. Makkonen, M. Nilsson, S. Viljainen
{"title":"西线一切平静?北欧电力市场的输电能力发展","authors":"M. Makkonen, M. Nilsson, S. Viljainen","doi":"10.5547/2160-5890.4.2.MMAK","DOIUrl":null,"url":null,"abstract":"Infrastructure plays an obvious and crucial role in electricity markets. Physical infrastructure must exist for the supply to meet demand in real time. In addition, it accommodates the efficient exchange of cost-efficient production across borders, and can bean important part ofsharingresourcesforreliabilitypurposes.However, in the historically successful Nordic electricity market, the cross-border transmission grid investments are lagging behind the original schedule agreed between the Nordic TSOs. Moreover, in early 2013, the Norwegian and Swedish Transmission System Operators (TSOs) cancelled the planned, by many considered critical, Hasle (Westlink) transmission capacity increase. This paper addresses several issues concerning the cross-border transmission planning and its role for successful integration of the electricity markets. We aim at evaluating the impact of different institutional requirements for key entities as well as the changing governance structure to highlight how the infrastructure development paths are dependent on these. The evaluation of the governance structure presented in this paper is based on the historical experiences of the Nordic electricity market. Our findings suggest that the national goals in transmission development contradict the Nordic capacity development targets.","PeriodicalId":385400,"journal":{"name":"Economics of Energy and Environmental Policy","volume":"113 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"All quiet on the western front? Transmission capacity development in the Nordic electricity market\",\"authors\":\"M. Makkonen, M. Nilsson, S. Viljainen\",\"doi\":\"10.5547/2160-5890.4.2.MMAK\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Infrastructure plays an obvious and crucial role in electricity markets. Physical infrastructure must exist for the supply to meet demand in real time. In addition, it accommodates the efficient exchange of cost-efficient production across borders, and can bean important part ofsharingresourcesforreliabilitypurposes.However, in the historically successful Nordic electricity market, the cross-border transmission grid investments are lagging behind the original schedule agreed between the Nordic TSOs. Moreover, in early 2013, the Norwegian and Swedish Transmission System Operators (TSOs) cancelled the planned, by many considered critical, Hasle (Westlink) transmission capacity increase. This paper addresses several issues concerning the cross-border transmission planning and its role for successful integration of the electricity markets. We aim at evaluating the impact of different institutional requirements for key entities as well as the changing governance structure to highlight how the infrastructure development paths are dependent on these. The evaluation of the governance structure presented in this paper is based on the historical experiences of the Nordic electricity market. Our findings suggest that the national goals in transmission development contradict the Nordic capacity development targets.\",\"PeriodicalId\":385400,\"journal\":{\"name\":\"Economics of Energy and Environmental Policy\",\"volume\":\"113 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Economics of Energy and Environmental Policy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5547/2160-5890.4.2.MMAK\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Economics of Energy and Environmental Policy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5547/2160-5890.4.2.MMAK","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

基础设施在电力市场中扮演着明显而关键的角色。物质基础设施必须存在,以便供应能够实时满足需求。此外,它适应了跨境高效交换成本效益的产品,并且可以成为共享资源的重要组成部分,以实现可靠性目的。然而,在历史上成功的北欧电力市场,跨境输电网投资落后于北欧tso之间商定的原始时间表。此外,2013年初,挪威和瑞典输电系统运营商(tso)取消了许多人认为至关重要的Hasle (Westlink)输电容量增加计划。本文讨论了跨境输电规划及其在电力市场成功整合中的作用。我们旨在评估对关键实体的不同制度要求的影响,以及不断变化的治理结构,以突出基础设施发展路径如何依赖于这些要求。本文对治理结构的评价是基于北欧电力市场的历史经验。我们的研究结果表明,国家在输电发展方面的目标与北欧的能力发展目标相矛盾。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
All quiet on the western front? Transmission capacity development in the Nordic electricity market
Infrastructure plays an obvious and crucial role in electricity markets. Physical infrastructure must exist for the supply to meet demand in real time. In addition, it accommodates the efficient exchange of cost-efficient production across borders, and can bean important part ofsharingresourcesforreliabilitypurposes.However, in the historically successful Nordic electricity market, the cross-border transmission grid investments are lagging behind the original schedule agreed between the Nordic TSOs. Moreover, in early 2013, the Norwegian and Swedish Transmission System Operators (TSOs) cancelled the planned, by many considered critical, Hasle (Westlink) transmission capacity increase. This paper addresses several issues concerning the cross-border transmission planning and its role for successful integration of the electricity markets. We aim at evaluating the impact of different institutional requirements for key entities as well as the changing governance structure to highlight how the infrastructure development paths are dependent on these. The evaluation of the governance structure presented in this paper is based on the historical experiences of the Nordic electricity market. Our findings suggest that the national goals in transmission development contradict the Nordic capacity development targets.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信