通过客户满意度指数(csi)测量和重要绩效分析对建设项目实习学习质量进行评价

Fahmy Hermawan, P. Puspitasari, Julia Damayanti, Lisa Oksri Nelfia, E. Kurniyaningrum, Giraldi Fardiaz Kuswanda
{"title":"通过客户满意度指数(csi)测量和重要绩效分析对建设项目实习学习质量进行评价","authors":"Fahmy Hermawan, P. Puspitasari, Julia Damayanti, Lisa Oksri Nelfia, E. Kurniyaningrum, Giraldi Fardiaz Kuswanda","doi":"10.25105/livas.v6i1.12924","DOIUrl":null,"url":null,"abstract":"Link and match between the world of business—industry and the flexibility—adaptability to rapid changes in the future,  aresome of the reasons why higher education equipped with the Merdeka Belajar-Kampus Merdeka or MBKM system isnecessary.  Internshipis one of the MBKM programs, which  provides opportunities for students to gain professional work experience in the business world or industry. Civil Engineering Study Program, Universitas Trisakti is organizing an Internship program on Construction Projects in the Odd semester of 2021/2022 academic year. This study is an attempt to share knowledge about stake holder perceptions (students, lecturers, staff, and cooperation partners) regarding the success and failure of the implementation of MBKM. The measurement was based on the priority and satisfaction levels, with the variables of educational infrastructure, reliability, responsiveness, empathy, treatment of students  and information systems. This is a quantitative descriptive study using a questionnaire distributed to 217 students, 26 permanent lecturers and 12 civil engineering administration staff as respondents. Cartesian diagram Importance Performance Analysis (IPA) is used to map the value of Customer Satisfaction  Index (CSI) which shows the level of stakeholde rsatisfactions. The results show that the CSI values (satisfaction level) areas follows: students has reached 75.67% as itisforadministration staff75.15%, where as  lecturers show a quite higher level which is 81.75%. In order to develop a well-organized MBKM in the future, institutions need to establish and manage programs interms of : coordinating between lecturers and field supervisors, adjusting field course\nMaterials to student needs, socializing the amount of MBKM funds to students participating  ininternships, and organizing remedial mechanisms. Based on the data analysis,100% of cooperating partners support the continuation of MBKM program and propose that qualified apprentices would become employees  in  their companies.\nKeywords: Construction Project, Internship Learning, Customer Satisfaction Index, Important-Performance Analysis.","PeriodicalId":133023,"journal":{"name":"International Journal on Livable Space","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"QUALITY OF CONSTRUCTION PROJECT INTERNSHIP LEARNING THROUGH CUSTOMER SATISFICATION INDEX (CSI) MEASUREMENT AND IMPORTANT-PERFORMANCE ANALYSIS\",\"authors\":\"Fahmy Hermawan, P. Puspitasari, Julia Damayanti, Lisa Oksri Nelfia, E. Kurniyaningrum, Giraldi Fardiaz Kuswanda\",\"doi\":\"10.25105/livas.v6i1.12924\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Link and match between the world of business—industry and the flexibility—adaptability to rapid changes in the future,  aresome of the reasons why higher education equipped with the Merdeka Belajar-Kampus Merdeka or MBKM system isnecessary.  Internshipis one of the MBKM programs, which  provides opportunities for students to gain professional work experience in the business world or industry. Civil Engineering Study Program, Universitas Trisakti is organizing an Internship program on Construction Projects in the Odd semester of 2021/2022 academic year. This study is an attempt to share knowledge about stake holder perceptions (students, lecturers, staff, and cooperation partners) regarding the success and failure of the implementation of MBKM. The measurement was based on the priority and satisfaction levels, with the variables of educational infrastructure, reliability, responsiveness, empathy, treatment of students  and information systems. This is a quantitative descriptive study using a questionnaire distributed to 217 students, 26 permanent lecturers and 12 civil engineering administration staff as respondents. Cartesian diagram Importance Performance Analysis (IPA) is used to map the value of Customer Satisfaction  Index (CSI) which shows the level of stakeholde rsatisfactions. The results show that the CSI values (satisfaction level) areas follows: students has reached 75.67% as itisforadministration staff75.15%, where as  lecturers show a quite higher level which is 81.75%. In order to develop a well-organized MBKM in the future, institutions need to establish and manage programs interms of : coordinating between lecturers and field supervisors, adjusting field course\\nMaterials to student needs, socializing the amount of MBKM funds to students participating  ininternships, and organizing remedial mechanisms. Based on the data analysis,100% of cooperating partners support the continuation of MBKM program and propose that qualified apprentices would become employees  in  their companies.\\nKeywords: Construction Project, Internship Learning, Customer Satisfaction Index, Important-Performance Analysis.\",\"PeriodicalId\":133023,\"journal\":{\"name\":\"International Journal on Livable Space\",\"volume\":\"79 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal on Livable Space\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25105/livas.v6i1.12924\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal on Livable Space","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/livas.v6i1.12924","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

商业世界与工业之间的联系和匹配,以及对未来快速变化的灵活性和适应性,是高等教育必须配备Merdeka Belajar-Kampus Merdeka或MBKM系统的一些原因。实习是MBKM项目之一,它为学生提供了在商业世界或工业中获得专业工作经验的机会。Trisakti大学土木工程研究项目将在2021/2022学年的奇数学期组织建筑项目实习项目。本研究旨在分享利益相关者(学生、讲师、员工和合作伙伴)对MBKM实施成败的看法。该测量基于优先级和满意度水平,包括教育基础设施、可靠性、响应能力、同理心、对待学生和信息系统等变量。这是一项定量描述性研究,使用问卷调查的217名学生,26名常任讲师和12名土木工程管理人员作为受访者。利用笛卡尔图重要性绩效分析(IPA)来映射客户满意度指数(CSI)的值,CSI表示利益相关者的满意度水平。结果表明,CSI值(满意度水平)范围如下:学生达到75.67%,行政人员达到75.15%,其中讲师的满意度水平更高,达到81.75%。为了在未来发展一个组织良好的MBKM,各院校需要在以下方面建立和管理项目:协调讲师和实地导师之间的关系,调整实地课程材料以适应学生的需求,将MBKM资金用于参与实习的学生,并组织补救机制。根据数据分析,100%的合作伙伴支持MBKM项目的延续,并建议将合格的学徒成为其公司的员工。关键词:建设项目,实习学习,客户满意度指数,重要绩效分析
本文章由计算机程序翻译,如有差异,请以英文原文为准。
QUALITY OF CONSTRUCTION PROJECT INTERNSHIP LEARNING THROUGH CUSTOMER SATISFICATION INDEX (CSI) MEASUREMENT AND IMPORTANT-PERFORMANCE ANALYSIS
Link and match between the world of business—industry and the flexibility—adaptability to rapid changes in the future,  aresome of the reasons why higher education equipped with the Merdeka Belajar-Kampus Merdeka or MBKM system isnecessary.  Internshipis one of the MBKM programs, which  provides opportunities for students to gain professional work experience in the business world or industry. Civil Engineering Study Program, Universitas Trisakti is organizing an Internship program on Construction Projects in the Odd semester of 2021/2022 academic year. This study is an attempt to share knowledge about stake holder perceptions (students, lecturers, staff, and cooperation partners) regarding the success and failure of the implementation of MBKM. The measurement was based on the priority and satisfaction levels, with the variables of educational infrastructure, reliability, responsiveness, empathy, treatment of students  and information systems. This is a quantitative descriptive study using a questionnaire distributed to 217 students, 26 permanent lecturers and 12 civil engineering administration staff as respondents. Cartesian diagram Importance Performance Analysis (IPA) is used to map the value of Customer Satisfaction  Index (CSI) which shows the level of stakeholde rsatisfactions. The results show that the CSI values (satisfaction level) areas follows: students has reached 75.67% as itisforadministration staff75.15%, where as  lecturers show a quite higher level which is 81.75%. In order to develop a well-organized MBKM in the future, institutions need to establish and manage programs interms of : coordinating between lecturers and field supervisors, adjusting field course Materials to student needs, socializing the amount of MBKM funds to students participating  ininternships, and organizing remedial mechanisms. Based on the data analysis,100% of cooperating partners support the continuation of MBKM program and propose that qualified apprentices would become employees  in  their companies. Keywords: Construction Project, Internship Learning, Customer Satisfaction Index, Important-Performance Analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信