{"title":"普诺省建筑工程设计阶段BIM实施计划","authors":"Yvan Huaricallo Vilca","doi":"10.11648/j.jccee.20220703.12","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":262934,"journal":{"name":"Journal of Civil, Construction and Environmental Engineering","volume":"62 12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"BIM Implementation Plan in Building Works in the Design Stage in the Provincial Municipality of Puno\",\"authors\":\"Yvan Huaricallo Vilca\",\"doi\":\"10.11648/j.jccee.20220703.12\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":262934,\"journal\":{\"name\":\"Journal of Civil, Construction and Environmental Engineering\",\"volume\":\"62 12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Civil, Construction and Environmental Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11648/j.jccee.20220703.12\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil, Construction and Environmental Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/j.jccee.20220703.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}