新的36千伏标准电压水平,以增加可再生能源在分输电网中的渗透

E. Carlini, C. Gadaleta, Alfonso De Cesare, M. Migliori, Chiara Giordano, S. Moroni
{"title":"新的36千伏标准电压水平,以增加可再生能源在分输电网中的渗透","authors":"E. Carlini, C. Gadaleta, Alfonso De Cesare, M. Migliori, Chiara Giordano, S. Moroni","doi":"10.23919/AEIT56783.2022.9951764","DOIUrl":null,"url":null,"abstract":"System efficiency and renewable technologies are the core elements of the energy transition, and their synergies are likewise important. In recent years the connection requests for RES power plants have significantly grown, mainly involving the High Voltage (HV) sub-transmission network. In this framework, the Italian Transmission System Operator (TSO) has designed novel technical and operational solutions allowing a secure and cost-efficient integration of new connections. This paper addresses the new 36 kV standard voltage level proposed for RES power plants with rated power lower than 100 MW. Furthermore, a representative case study on the southern areas of Italy is illustrated. Increase of RES penetration margin by exploitation of operation islands is also assessed.","PeriodicalId":253384,"journal":{"name":"2022 AEIT International Annual Conference (AEIT)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The new 36 kV standard voltage level to increase RES penetration in sub-transmission network\",\"authors\":\"E. Carlini, C. Gadaleta, Alfonso De Cesare, M. Migliori, Chiara Giordano, S. Moroni\",\"doi\":\"10.23919/AEIT56783.2022.9951764\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"System efficiency and renewable technologies are the core elements of the energy transition, and their synergies are likewise important. In recent years the connection requests for RES power plants have significantly grown, mainly involving the High Voltage (HV) sub-transmission network. In this framework, the Italian Transmission System Operator (TSO) has designed novel technical and operational solutions allowing a secure and cost-efficient integration of new connections. This paper addresses the new 36 kV standard voltage level proposed for RES power plants with rated power lower than 100 MW. Furthermore, a representative case study on the southern areas of Italy is illustrated. Increase of RES penetration margin by exploitation of operation islands is also assessed.\",\"PeriodicalId\":253384,\"journal\":{\"name\":\"2022 AEIT International Annual Conference (AEIT)\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 AEIT International Annual Conference (AEIT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23919/AEIT56783.2022.9951764\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 AEIT International Annual Conference (AEIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/AEIT56783.2022.9951764","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

系统效率和可再生技术是能源转型的核心要素,它们的协同作用同样重要。近年来,可再生能源电厂的接入需求显著增长,主要涉及高压(HV)分输电网。在此框架下,意大利输电系统运营商(TSO)设计了新颖的技术和操作解决方案,从而实现了安全且经济高效的新连接集成。本文讨论了额定功率低于100mw的可再生能源电厂新提出的36kv标准电压等级。此外,本文还对意大利南部地区的典型案例进行了分析。并对利用作战岛增加RES穿透余量进行了评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The new 36 kV standard voltage level to increase RES penetration in sub-transmission network
System efficiency and renewable technologies are the core elements of the energy transition, and their synergies are likewise important. In recent years the connection requests for RES power plants have significantly grown, mainly involving the High Voltage (HV) sub-transmission network. In this framework, the Italian Transmission System Operator (TSO) has designed novel technical and operational solutions allowing a secure and cost-efficient integration of new connections. This paper addresses the new 36 kV standard voltage level proposed for RES power plants with rated power lower than 100 MW. Furthermore, a representative case study on the southern areas of Italy is illustrated. Increase of RES penetration margin by exploitation of operation islands is also assessed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信