{"title":"核电一期工程(Ap1000)汽轮机厂房建筑设计探讨","authors":"Zhaohui Huang","doi":"10.26789/jzjg.2019.01.006","DOIUrl":null,"url":null,"abstract":"A nuclear power project phase I (AP1000) has many “world No.1”. It is so many “first”, put forward unprecedented challenges to the design of the turbine building. This paper introduces the composition of each part of the turbine building, and analyses the problems of the turbine building, such as traffic evacuation, fire prevention, waterproof, lighting, ventilation, corrosion prevention. The characteristics of turbine building design are further discussed. The energy saving of turbine building and the design method and process of the building facade are also analyzed. The completion and production of the Nuclear Power Project Phase I have accumulated valuable experience and provided reference for subsequent projects.","PeriodicalId":305807,"journal":{"name":"城市建设理论研究—建筑结构","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Discussion on the Architectural Design of the Turbine Building of a Nuclear Power Project Phase I (Ap1000)\",\"authors\":\"Zhaohui Huang\",\"doi\":\"10.26789/jzjg.2019.01.006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A nuclear power project phase I (AP1000) has many “world No.1”. It is so many “first”, put forward unprecedented challenges to the design of the turbine building. This paper introduces the composition of each part of the turbine building, and analyses the problems of the turbine building, such as traffic evacuation, fire prevention, waterproof, lighting, ventilation, corrosion prevention. The characteristics of turbine building design are further discussed. The energy saving of turbine building and the design method and process of the building facade are also analyzed. The completion and production of the Nuclear Power Project Phase I have accumulated valuable experience and provided reference for subsequent projects.\",\"PeriodicalId\":305807,\"journal\":{\"name\":\"城市建设理论研究—建筑结构\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"城市建设理论研究—建筑结构\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26789/jzjg.2019.01.006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"城市建设理论研究—建筑结构","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26789/jzjg.2019.01.006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Discussion on the Architectural Design of the Turbine Building of a Nuclear Power Project Phase I (Ap1000)
A nuclear power project phase I (AP1000) has many “world No.1”. It is so many “first”, put forward unprecedented challenges to the design of the turbine building. This paper introduces the composition of each part of the turbine building, and analyses the problems of the turbine building, such as traffic evacuation, fire prevention, waterproof, lighting, ventilation, corrosion prevention. The characteristics of turbine building design are further discussed. The energy saving of turbine building and the design method and process of the building facade are also analyzed. The completion and production of the Nuclear Power Project Phase I have accumulated valuable experience and provided reference for subsequent projects.