Turki A. Al-Harbi, Maad M. Al-Owaifeer, F. Al-Ismail
{"title":"以可靠性为中心的人工智能维修系统开发","authors":"Turki A. Al-Harbi, Maad M. Al-Owaifeer, F. Al-Ismail","doi":"10.1109/SASG57022.2022.10199533","DOIUrl":null,"url":null,"abstract":"This paper presents the importance of developing a Reliability Centered Mmaintenance system (RCM) due to the problems that have arisen during the operation of power transformers. The paper also, aims to provide practical solutions using artificial intelligence, with results and recommendations presented at the end of the paper and a review of important references in this regard.","PeriodicalId":206589,"journal":{"name":"2022 Saudi Arabia Smart Grid (SASG)","volume":"109 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of Reliability Centered Maintenance System Using Artificial Intelligence\",\"authors\":\"Turki A. Al-Harbi, Maad M. Al-Owaifeer, F. Al-Ismail\",\"doi\":\"10.1109/SASG57022.2022.10199533\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the importance of developing a Reliability Centered Mmaintenance system (RCM) due to the problems that have arisen during the operation of power transformers. The paper also, aims to provide practical solutions using artificial intelligence, with results and recommendations presented at the end of the paper and a review of important references in this regard.\",\"PeriodicalId\":206589,\"journal\":{\"name\":\"2022 Saudi Arabia Smart Grid (SASG)\",\"volume\":\"109 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 Saudi Arabia Smart Grid (SASG)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SASG57022.2022.10199533\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 Saudi Arabia Smart Grid (SASG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SASG57022.2022.10199533","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Development of Reliability Centered Maintenance System Using Artificial Intelligence
This paper presents the importance of developing a Reliability Centered Mmaintenance system (RCM) due to the problems that have arisen during the operation of power transformers. The paper also, aims to provide practical solutions using artificial intelligence, with results and recommendations presented at the end of the paper and a review of important references in this regard.