预防性维护和故障维护对生产过程平稳运行的影响(以CV为例)。Dira Mahakarya Utama (Ciamis摄政印刷)

A. Nurhidayat, Suci Putri Lestari, Rita Tri Yusnita
{"title":"预防性维护和故障维护对生产过程平稳运行的影响(以CV为例)。Dira Mahakarya Utama (Ciamis摄政印刷)","authors":"A. Nurhidayat, Suci Putri Lestari, Rita Tri Yusnita","doi":"10.53697/jim.v2i3.894","DOIUrl":null,"url":null,"abstract":"This study aims to determine the Effect of Preventive Maintenence and Breakown Maintenence on the smooth running of the Production Process (Case study on CV. Dira Mahakarya Utama Printing Ciamis Regency). The method used in this study is a casual associative method (causation) with a quantitative approach, as for what is used as a sample, namely data on preventive maintenence costs, maintenence breakdown costs, and production target data for the last 4 years, namely in the 2018-2021 period at the Dira Mahakarya Utama printing house. The analysis tool used in this study was multiple linear regression using SPSS Version 25. The results showed that simultaneously the disciplines of Preventive Maintenence and Breakdown Maintenence had a significant effect on the smooth running of the production process. Partially Preventive Maintenence has a significant effect on the smooth running of the production process. Partial Breakdown Maintenence does not have a significant effect on the smooth running of the Production Process.","PeriodicalId":375257,"journal":{"name":"Journal of Indonesian Management (JIM)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Effect Of Preventive Maintenance And Breakdown Maintenance On The Smooth Running Of The Production Process (Case studies on CV. Dira Mahakarya Utama of Ciamis Regency Printing)\",\"authors\":\"A. Nurhidayat, Suci Putri Lestari, Rita Tri Yusnita\",\"doi\":\"10.53697/jim.v2i3.894\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to determine the Effect of Preventive Maintenence and Breakown Maintenence on the smooth running of the Production Process (Case study on CV. Dira Mahakarya Utama Printing Ciamis Regency). The method used in this study is a casual associative method (causation) with a quantitative approach, as for what is used as a sample, namely data on preventive maintenence costs, maintenence breakdown costs, and production target data for the last 4 years, namely in the 2018-2021 period at the Dira Mahakarya Utama printing house. The analysis tool used in this study was multiple linear regression using SPSS Version 25. The results showed that simultaneously the disciplines of Preventive Maintenence and Breakdown Maintenence had a significant effect on the smooth running of the production process. Partially Preventive Maintenence has a significant effect on the smooth running of the production process. Partial Breakdown Maintenence does not have a significant effect on the smooth running of the Production Process.\",\"PeriodicalId\":375257,\"journal\":{\"name\":\"Journal of Indonesian Management (JIM)\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Indonesian Management (JIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53697/jim.v2i3.894\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Indonesian Management (JIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53697/jim.v2i3.894","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在确定预防性维修和断裂维修对生产过程顺利运行的影响(以CV为例)。Dira Mahakarya Utama印刷Ciamis摄政)。本研究中使用的方法是随机关联法(因果关系)和定量方法,作为样本,即Dira Mahakarya Utama印刷厂2018-2021年期间的预防性维护成本数据、维护故障成本数据和生产目标数据。本研究使用的分析工具是多元线性回归,使用SPSS Version 25。结果表明,预防性维修和故障维修同时进行,对生产过程的顺利进行有着重要的影响。局部预防性维护对生产过程的顺利进行有着重要的影响。局部故障维修对生产过程的顺利运行没有显著影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Effect Of Preventive Maintenance And Breakdown Maintenance On The Smooth Running Of The Production Process (Case studies on CV. Dira Mahakarya Utama of Ciamis Regency Printing)
This study aims to determine the Effect of Preventive Maintenence and Breakown Maintenence on the smooth running of the Production Process (Case study on CV. Dira Mahakarya Utama Printing Ciamis Regency). The method used in this study is a casual associative method (causation) with a quantitative approach, as for what is used as a sample, namely data on preventive maintenence costs, maintenence breakdown costs, and production target data for the last 4 years, namely in the 2018-2021 period at the Dira Mahakarya Utama printing house. The analysis tool used in this study was multiple linear regression using SPSS Version 25. The results showed that simultaneously the disciplines of Preventive Maintenence and Breakdown Maintenence had a significant effect on the smooth running of the production process. Partially Preventive Maintenence has a significant effect on the smooth running of the production process. Partial Breakdown Maintenence does not have a significant effect on the smooth running of the Production Process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信