二工序三机流程车间的干扰作业集调度

N. H. Tuong, A. Soukhal
{"title":"二工序三机流程车间的干扰作业集调度","authors":"N. H. Tuong, A. Soukhal","doi":"10.1109/RIVF.2009.5174646","DOIUrl":null,"url":null,"abstract":"This paper considers three machine flowshop scheduling problem with two agents. The jobs of first agent have two operations executed in the same order, on M 1 and then on M 2 respectively. According to the second agent, the jobs should be executed on M 2 and then on M 3 . Thus, the second machine M 2 has to be shared to perform all of jobs. The objective is to minimize at the same time the makespan of each job set. The epsiv-constraint approach is utilized, i.e. the maximum completion time of the one agent has to be minimized while the maximum completion time of the other is bounded. This scheduling problem was proved as binary NP-hard. In this study, a pseudo-polynomial algorithm is proposed.","PeriodicalId":243397,"journal":{"name":"2009 IEEE-RIVF International Conference on Computing and Communication Technologies","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Interfering Job Set Scheduling on Two-Operation Three-Machine Flowshop\",\"authors\":\"N. H. Tuong, A. Soukhal\",\"doi\":\"10.1109/RIVF.2009.5174646\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper considers three machine flowshop scheduling problem with two agents. The jobs of first agent have two operations executed in the same order, on M 1 and then on M 2 respectively. According to the second agent, the jobs should be executed on M 2 and then on M 3 . Thus, the second machine M 2 has to be shared to perform all of jobs. The objective is to minimize at the same time the makespan of each job set. The epsiv-constraint approach is utilized, i.e. the maximum completion time of the one agent has to be minimized while the maximum completion time of the other is bounded. This scheduling problem was proved as binary NP-hard. In this study, a pseudo-polynomial algorithm is proposed.\",\"PeriodicalId\":243397,\"journal\":{\"name\":\"2009 IEEE-RIVF International Conference on Computing and Communication Technologies\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE-RIVF International Conference on Computing and Communication Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RIVF.2009.5174646\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE-RIVF International Conference on Computing and Communication Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RIVF.2009.5174646","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

研究了具有两个智能体的三机器流水车间调度问题。第一个agent的作业有两个以相同顺序执行的操作,分别在m1和m2上执行。根据第二个代理,作业应该先在m2上执行,然后再在m3上执行。因此,必须共享第二台机器m2来执行所有作业。目标是同时最小化每个作业集的完工时间。利用epsiv约束方法,即一个agent的最大完成时间必须最小化,而另一个agent的最大完成时间是有界的。证明了该调度问题是二进制np困难的。本文提出了一种伪多项式算法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Interfering Job Set Scheduling on Two-Operation Three-Machine Flowshop
This paper considers three machine flowshop scheduling problem with two agents. The jobs of first agent have two operations executed in the same order, on M 1 and then on M 2 respectively. According to the second agent, the jobs should be executed on M 2 and then on M 3 . Thus, the second machine M 2 has to be shared to perform all of jobs. The objective is to minimize at the same time the makespan of each job set. The epsiv-constraint approach is utilized, i.e. the maximum completion time of the one agent has to be minimized while the maximum completion time of the other is bounded. This scheduling problem was proved as binary NP-hard. In this study, a pseudo-polynomial algorithm is proposed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信