{"title":"实现准确估算项目时间和成本,完善“挣值管理体系”的挣值指标实施与评价","authors":"I. Attarzadeh, Ow Siew Hock","doi":"10.1109/ICIME.2009.22","DOIUrl":null,"url":null,"abstract":"This paper presents an implementation and evaluation of Earned Value (EV) method of projects to improve earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index (CPI), Cost Variance (CV), Schedule Variance (SV). The model has been validated by a simulation study using a progress generator a new software. This software was developed in Visual Studio 2008 – Visual Basic .NET 2008 and Microsoft Office Project 2007 and it included some basic assumptions and data were generated day by day randomly. The results show a strong relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.","PeriodicalId":445284,"journal":{"name":"2009 International Conference on Information Management and Engineering","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Implementation and Evaluation of Earned Value Index to Achieve an Accurate Project Time and Cost Estimation and Improve \\\"Earned Value Management System\\\"\",\"authors\":\"I. Attarzadeh, Ow Siew Hock\",\"doi\":\"10.1109/ICIME.2009.22\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an implementation and evaluation of Earned Value (EV) method of projects to improve earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index (CPI), Cost Variance (CV), Schedule Variance (SV). The model has been validated by a simulation study using a progress generator a new software. This software was developed in Visual Studio 2008 – Visual Basic .NET 2008 and Microsoft Office Project 2007 and it included some basic assumptions and data were generated day by day randomly. The results show a strong relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.\",\"PeriodicalId\":445284,\"journal\":{\"name\":\"2009 International Conference on Information Management and Engineering\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 International Conference on Information Management and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIME.2009.22\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Information Management and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIME.2009.22","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
摘要
本文提出了一种项目挣值方法的实施和评价方法,以改进项目挣值管理系统,预测项目的时间和成本。这些方法建立了四个变量:计划绩效指数(SPI)、成本绩效指数(CPI)、成本方差(CV)、计划方差(SV)。利用进度生成器软件进行了仿真研究,验证了模型的有效性。本软件是在Visual Studio 2008 - Visual Basic . net 2008和Microsoft Office Project 2007中开发的,它包含了一些基本的假设,数据是每天随机生成的。结果表明,反应变量与上述四个预测因子之间存在较强的相关性。因此,可以得出结论,该模型可以在广泛的项目中用于EAC估算。
Implementation and Evaluation of Earned Value Index to Achieve an Accurate Project Time and Cost Estimation and Improve "Earned Value Management System"
This paper presents an implementation and evaluation of Earned Value (EV) method of projects to improve earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index (CPI), Cost Variance (CV), Schedule Variance (SV). The model has been validated by a simulation study using a progress generator a new software. This software was developed in Visual Studio 2008 – Visual Basic .NET 2008 and Microsoft Office Project 2007 and it included some basic assumptions and data were generated day by day randomly. The results show a strong relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.