{"title":"与双馈感应发电机连接的发电机断路器的挑战","authors":"A. Marmolejo, M. Palazzo, M. Delfanti","doi":"10.1109/CENCON.2014.6967500","DOIUrl":null,"url":null,"abstract":"Variable-speed turbines have gained increasing importance in pump-storage power stations since they present big advantages compared to the classical topology with a synchronous generator. Within the variable-speed solutions, the one employing a doubly-fed induction generator (DFIG) has become the preferred solution for large installations since it provides the advantages of variable-speed operation and four-quadrant active and reactive power capabilities using converters rated only a small fraction of the rated power. A deep understanding of the characteristics of the fault current fed by a DFIG after a three-phase short-circuit at its terminals is of utmost importance to define the requirements of the generator circuit-breaker (GenCB) to be installed between the generator and the step-up transformer. The only standard which covers the requirements for GenCBs is IEEE Std C37.013-1997 (R2008) with its amendment IEEE Std C37.013a-2007; which will be soon replaced by the IEC/IEEE Joint Development IEC/IEEE 62271-37-013. The requirements laid down in this standard are based upon applications employing synchronous generators. The question whether these requirements are adequate for the application of GenCBs in pump-storage power stations employing DFIGs is considered in the present work.","PeriodicalId":342510,"journal":{"name":"2014 IEEE Conference on Energy Conversion (CENCON)","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Challenges for generator circuit-breakers connected with doubly-fed induction generators\",\"authors\":\"A. Marmolejo, M. Palazzo, M. Delfanti\",\"doi\":\"10.1109/CENCON.2014.6967500\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Variable-speed turbines have gained increasing importance in pump-storage power stations since they present big advantages compared to the classical topology with a synchronous generator. Within the variable-speed solutions, the one employing a doubly-fed induction generator (DFIG) has become the preferred solution for large installations since it provides the advantages of variable-speed operation and four-quadrant active and reactive power capabilities using converters rated only a small fraction of the rated power. A deep understanding of the characteristics of the fault current fed by a DFIG after a three-phase short-circuit at its terminals is of utmost importance to define the requirements of the generator circuit-breaker (GenCB) to be installed between the generator and the step-up transformer. The only standard which covers the requirements for GenCBs is IEEE Std C37.013-1997 (R2008) with its amendment IEEE Std C37.013a-2007; which will be soon replaced by the IEC/IEEE Joint Development IEC/IEEE 62271-37-013. The requirements laid down in this standard are based upon applications employing synchronous generators. The question whether these requirements are adequate for the application of GenCBs in pump-storage power stations employing DFIGs is considered in the present work.\",\"PeriodicalId\":342510,\"journal\":{\"name\":\"2014 IEEE Conference on Energy Conversion (CENCON)\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE Conference on Energy Conversion (CENCON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CENCON.2014.6967500\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Conference on Energy Conversion (CENCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CENCON.2014.6967500","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Challenges for generator circuit-breakers connected with doubly-fed induction generators
Variable-speed turbines have gained increasing importance in pump-storage power stations since they present big advantages compared to the classical topology with a synchronous generator. Within the variable-speed solutions, the one employing a doubly-fed induction generator (DFIG) has become the preferred solution for large installations since it provides the advantages of variable-speed operation and four-quadrant active and reactive power capabilities using converters rated only a small fraction of the rated power. A deep understanding of the characteristics of the fault current fed by a DFIG after a three-phase short-circuit at its terminals is of utmost importance to define the requirements of the generator circuit-breaker (GenCB) to be installed between the generator and the step-up transformer. The only standard which covers the requirements for GenCBs is IEEE Std C37.013-1997 (R2008) with its amendment IEEE Std C37.013a-2007; which will be soon replaced by the IEC/IEEE Joint Development IEC/IEEE 62271-37-013. The requirements laid down in this standard are based upon applications employing synchronous generators. The question whether these requirements are adequate for the application of GenCBs in pump-storage power stations employing DFIGs is considered in the present work.