{"title":"在瑞士使用WIM更新桥梁轴载荷","authors":"Matthew Sjaarda, A. Nussbaumer, D. Papastergiou","doi":"10.2749/ghent.2021.0748","DOIUrl":null,"url":null,"abstract":"The Eurocode LM1 for traffic loads on bridges features side-by-side tandem axles, as well as uniformly distributed lane loads. This LM is mirrored in the Swiss code SIA 261, for new structures, as well as SIA 269, for existing structures, where updating is permitted based on existing traffic in the form of updated alpha factors, αQ1 and αQ2. The research herein uses an extensive WIM database to update alpha factors for Swiss traffic. For the first (slow) lane, this is done using simple block maxima of tandem axle statistics (daily, weekly, and yearly block maxima results are compared) with log-normal fitting to the extreme value statistic. For the second lane, a novel approach is used which reconstructs real multiple-presence scenarios from the WIM data to predict the total joint load across both lanes. The result of the single lane and joint analyses are recommended updated alpha factors reduced by a factor of one third as compared to those mandated for new construction.","PeriodicalId":162435,"journal":{"name":"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Updating bridge axle loads using WIM in Switzerland\",\"authors\":\"Matthew Sjaarda, A. Nussbaumer, D. Papastergiou\",\"doi\":\"10.2749/ghent.2021.0748\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Eurocode LM1 for traffic loads on bridges features side-by-side tandem axles, as well as uniformly distributed lane loads. This LM is mirrored in the Swiss code SIA 261, for new structures, as well as SIA 269, for existing structures, where updating is permitted based on existing traffic in the form of updated alpha factors, αQ1 and αQ2. The research herein uses an extensive WIM database to update alpha factors for Swiss traffic. For the first (slow) lane, this is done using simple block maxima of tandem axle statistics (daily, weekly, and yearly block maxima results are compared) with log-normal fitting to the extreme value statistic. For the second lane, a novel approach is used which reconstructs real multiple-presence scenarios from the WIM data to predict the total joint load across both lanes. The result of the single lane and joint analyses are recommended updated alpha factors reduced by a factor of one third as compared to those mandated for new construction.\",\"PeriodicalId\":162435,\"journal\":{\"name\":\"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2749/ghent.2021.0748\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/ghent.2021.0748","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

欧洲规范LM1规定了桥梁上的交通荷载,包括并排的串联轴,以及均匀分布的车道荷载。这个LM反映在瑞士代码SIA 261(适用于新结构)和SIA 269(适用于现有结构)中,其中允许基于现有流量以更新α因子αQ1和αQ2的形式进行更新。本文的研究使用了一个广泛的WIM数据库来更新瑞士交通的alpha因子。对于第一(慢速)车道,使用简单的块最大值串联轴统计(每日,每周和每年块最大值结果进行比较)与对数正态拟合到极值统计。对于第二车道,采用了一种新颖的方法,该方法从WIM数据中重建真实的多存在场景,以预测两车道的总节点荷载。建议单车道和联合分析的结果更新了alpha因子,与新建筑的规定相比,alpha因子减少了三分之一。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Updating bridge axle loads using WIM in Switzerland
The Eurocode LM1 for traffic loads on bridges features side-by-side tandem axles, as well as uniformly distributed lane loads. This LM is mirrored in the Swiss code SIA 261, for new structures, as well as SIA 269, for existing structures, where updating is permitted based on existing traffic in the form of updated alpha factors, αQ1 and αQ2. The research herein uses an extensive WIM database to update alpha factors for Swiss traffic. For the first (slow) lane, this is done using simple block maxima of tandem axle statistics (daily, weekly, and yearly block maxima results are compared) with log-normal fitting to the extreme value statistic. For the second lane, a novel approach is used which reconstructs real multiple-presence scenarios from the WIM data to predict the total joint load across both lanes. The result of the single lane and joint analyses are recommended updated alpha factors reduced by a factor of one third as compared to those mandated for new construction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信