解决建筑纠纷的专业技术:有多少种方法可以让猫被剥皮?

Michael Patchett-Joyce
{"title":"解决建筑纠纷的专业技术:有多少种方法可以让猫被剥皮?","authors":"Michael Patchett-Joyce","doi":"10.54648/bcdr2017006","DOIUrl":null,"url":null,"abstract":"Parties to construction and infrastructure projects have been at the forefront of developing and/or adopting a range of dispute avoidance and resolution measures: partnering, dispute boards, adjudication, expedited (or ‘fast-track’) arbitration, and mediation. Closer analysis reveals that preferences vary according to region, as does the take-up of such initiatives.This article looks at what methods have worked in the Gulf, and what other techniques might usefully be deployed. Some methods, like partnering and expedited arbitration, may have been advocated previously with mixed results.The article contends that this was not because of some inherent unsuitability, but because the time was not right. The article looks at a new partnering initiative, discusses dispute boards and adjudication, and considers the continued roll-out of expedited procedures by arbitral institutions (including the new ICC Rules, effective as from March 2017).The article explains how innovative and creative dispute resolution techniques might usefully be applied in the context of Gulf mega-projects.","PeriodicalId":166341,"journal":{"name":"BCDR International Arbitration Review","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Specialist Techniques for Construction Dispute Resolution: How Many Ways Can the Cat Be Skinned?\",\"authors\":\"Michael Patchett-Joyce\",\"doi\":\"10.54648/bcdr2017006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Parties to construction and infrastructure projects have been at the forefront of developing and/or adopting a range of dispute avoidance and resolution measures: partnering, dispute boards, adjudication, expedited (or ‘fast-track’) arbitration, and mediation. Closer analysis reveals that preferences vary according to region, as does the take-up of such initiatives.This article looks at what methods have worked in the Gulf, and what other techniques might usefully be deployed. Some methods, like partnering and expedited arbitration, may have been advocated previously with mixed results.The article contends that this was not because of some inherent unsuitability, but because the time was not right. The article looks at a new partnering initiative, discusses dispute boards and adjudication, and considers the continued roll-out of expedited procedures by arbitral institutions (including the new ICC Rules, effective as from March 2017).The article explains how innovative and creative dispute resolution techniques might usefully be applied in the context of Gulf mega-projects.\",\"PeriodicalId\":166341,\"journal\":{\"name\":\"BCDR International Arbitration Review\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"BCDR International Arbitration Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54648/bcdr2017006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"BCDR International Arbitration Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54648/bcdr2017006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建设和基础设施项目的当事方一直走在制定和/或采用一系列避免和解决争议措施的前沿:合作、争议委员会、裁决、快速(或“快速通道”)仲裁和调解。更仔细的分析表明,不同地区的偏好不同,对此类举措的接受程度也不同。本文将介绍在海湾地区行之有效的方法,以及可能采用的其他有用技术。有些方法,如伙伴关系和快速仲裁,以前可能已经提倡,结果好坏参半。文章认为,这并不是因为某些固有的不合适,而是因为时机不对。本文着眼于一项新的合作倡议,讨论了争议委员会和裁决,并考虑了仲裁机构不断推出的快速程序(包括自2017年3月起生效的新的国际商会规则)。这篇文章解释了如何在海湾大型项目的背景下有效地应用创新和创造性的争议解决技术。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Specialist Techniques for Construction Dispute Resolution: How Many Ways Can the Cat Be Skinned?
Parties to construction and infrastructure projects have been at the forefront of developing and/or adopting a range of dispute avoidance and resolution measures: partnering, dispute boards, adjudication, expedited (or ‘fast-track’) arbitration, and mediation. Closer analysis reveals that preferences vary according to region, as does the take-up of such initiatives.This article looks at what methods have worked in the Gulf, and what other techniques might usefully be deployed. Some methods, like partnering and expedited arbitration, may have been advocated previously with mixed results.The article contends that this was not because of some inherent unsuitability, but because the time was not right. The article looks at a new partnering initiative, discusses dispute boards and adjudication, and considers the continued roll-out of expedited procedures by arbitral institutions (including the new ICC Rules, effective as from March 2017).The article explains how innovative and creative dispute resolution techniques might usefully be applied in the context of Gulf mega-projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信