{"title":"大规模维护过程的早期工作量估计","authors":"A. D. Lucia, M. D. Penta, Silvio Stefanucci, Gabriele Venturi","doi":"10.1109/ICSM.2002.1167771","DOIUrl":null,"url":null,"abstract":"Effort estimation is a valuable asset to managers in planning maintenance activities and performing cost/benefit analysis. Early estimates and accurate evaluations permit to significantly reduce project risks and to improve resource scheduling. In this paper we present an approach for an early effort estimation based on the knowledge of a fraction of the programs composing the work-packet. As a case study, the proposed approach has been applied to a large massive maintenance project performed by a major international software enterprise.","PeriodicalId":385190,"journal":{"name":"International Conference on Software Maintenance, 2002. Proceedings.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2002-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Early effort estimation of massive maintenance processes\",\"authors\":\"A. D. Lucia, M. D. Penta, Silvio Stefanucci, Gabriele Venturi\",\"doi\":\"10.1109/ICSM.2002.1167771\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Effort estimation is a valuable asset to managers in planning maintenance activities and performing cost/benefit analysis. Early estimates and accurate evaluations permit to significantly reduce project risks and to improve resource scheduling. In this paper we present an approach for an early effort estimation based on the knowledge of a fraction of the programs composing the work-packet. As a case study, the proposed approach has been applied to a large massive maintenance project performed by a major international software enterprise.\",\"PeriodicalId\":385190,\"journal\":{\"name\":\"International Conference on Software Maintenance, 2002. Proceedings.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-10-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Conference on Software Maintenance, 2002. Proceedings.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSM.2002.1167771\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Software Maintenance, 2002. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSM.2002.1167771","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Early effort estimation of massive maintenance processes
Effort estimation is a valuable asset to managers in planning maintenance activities and performing cost/benefit analysis. Early estimates and accurate evaluations permit to significantly reduce project risks and to improve resource scheduling. In this paper we present an approach for an early effort estimation based on the knowledge of a fraction of the programs composing the work-packet. As a case study, the proposed approach has been applied to a large massive maintenance project performed by a major international software enterprise.