{"title":"卢旺达的资源管理实践和项目绩效:以技能发展基金项目为例","authors":"Ms. Solange Uwase, Dr. Eugenia Nkechi Irechukwu","doi":"10.53819/81018102t2167","DOIUrl":null,"url":null,"abstract":"This study examined the effect of resources management practices on project performance specifically in Skills Development Fund Project. The researcher used descriptive research design with qualitative and quantitative approaches. The target population was 1340 project beneficiaries, stakeholder and external parties and the sample size was 297 respondents calculated using Krejcie and Morgan Table. The researcher used simple random sampling techniques for selecting the sample size. Data collection tools were questionnaire and interview guide. The results of first objective indicate that project team acquisition has a significant positive effect on the performance of SDF projects in Rwanda. The respondents strongly agreed with this assertion, as reflected by the overall mean score of 4.235. The correlation analysis further supported these findings, revealing a strong relationship between project team acquisition and timely completion (r=0.933), completion with required quality (r=0.959)","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Resources Management Practices and Project Performance in Rwanda: A Case of Skills Development Fund Project\",\"authors\":\"Ms. Solange Uwase, Dr. Eugenia Nkechi Irechukwu\",\"doi\":\"10.53819/81018102t2167\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study examined the effect of resources management practices on project performance specifically in Skills Development Fund Project. The researcher used descriptive research design with qualitative and quantitative approaches. The target population was 1340 project beneficiaries, stakeholder and external parties and the sample size was 297 respondents calculated using Krejcie and Morgan Table. The researcher used simple random sampling techniques for selecting the sample size. Data collection tools were questionnaire and interview guide. The results of first objective indicate that project team acquisition has a significant positive effect on the performance of SDF projects in Rwanda. The respondents strongly agreed with this assertion, as reflected by the overall mean score of 4.235. The correlation analysis further supported these findings, revealing a strong relationship between project team acquisition and timely completion (r=0.933), completion with required quality (r=0.959)\",\"PeriodicalId\":176307,\"journal\":{\"name\":\"Journal of Entrepreneurship & Project Management\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Entrepreneurship & Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53819/81018102t2167\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Entrepreneurship & Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53819/81018102t2167","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究考察了资源管理实践对项目绩效的影响,特别是在技能发展基金项目中。研究者采用定性和定量方法相结合的描述性研究设计。目标人群为1340名项目受益人、利益相关者和外部方,样本量为297名受访者,使用Krejcie和Morgan表计算。研究人员使用简单的随机抽样技术来选择样本量。数据收集工具为问卷调查和访谈指南。第一个目标的结果表明,项目团队获取对卢旺达SDF项目的绩效有显著的积极影响。受访者强烈同意这一说法,这反映在整体平均得分为4.235分。相关分析进一步支持了这些发现,揭示了项目团队获取与及时完成(r=0.933)、以要求的质量完成(r=0.959)之间的强烈关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Resources Management Practices and Project Performance in Rwanda: A Case of Skills Development Fund Project
This study examined the effect of resources management practices on project performance specifically in Skills Development Fund Project. The researcher used descriptive research design with qualitative and quantitative approaches. The target population was 1340 project beneficiaries, stakeholder and external parties and the sample size was 297 respondents calculated using Krejcie and Morgan Table. The researcher used simple random sampling techniques for selecting the sample size. Data collection tools were questionnaire and interview guide. The results of first objective indicate that project team acquisition has a significant positive effect on the performance of SDF projects in Rwanda. The respondents strongly agreed with this assertion, as reflected by the overall mean score of 4.235. The correlation analysis further supported these findings, revealing a strong relationship between project team acquisition and timely completion (r=0.933), completion with required quality (r=0.959)
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信