{"title":"高效多分支完井的完井偏转器下入和测试工具的设计、测试和运行","authors":"M. Stokes, Boris Lajesic, Christian Ramírez, Lester Barett Dupler","doi":"10.4043/29481-MS","DOIUrl":null,"url":null,"abstract":"\n Trip optimization is essential in multilateral well construction, especially for extended-reach drilling (ERD) wells. This paper describes the design, testing, and operation of a completion deflector running and test tool (RTT) that was recently used during completion of one of the industry's deepest extended-reach multilateral wells. The RTT allows for running and pressure testing of a completion deflector and lower completion components in a single trip, thus saving at least one trip, and up to three trips.\n The challenge was to develop the capability to run a completion deflector with an existing pressure test tool. This was accomplished by converting the pressure test tool into a running tool. The new pressure actuated mechanism built into the tool releases the completion deflector automatically after a successful pressure test. A secondary release mechanism was also incorporated for contingency options. Extensive engineering qualification tests validated the new features to be highly reliable.","PeriodicalId":214691,"journal":{"name":"Day 4 Thu, May 09, 2019","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design, Testing, and Operation of a Completion Deflector Running and Test Tool for Efficient Multilateral Completions\",\"authors\":\"M. Stokes, Boris Lajesic, Christian Ramírez, Lester Barett Dupler\",\"doi\":\"10.4043/29481-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Trip optimization is essential in multilateral well construction, especially for extended-reach drilling (ERD) wells. This paper describes the design, testing, and operation of a completion deflector running and test tool (RTT) that was recently used during completion of one of the industry's deepest extended-reach multilateral wells. The RTT allows for running and pressure testing of a completion deflector and lower completion components in a single trip, thus saving at least one trip, and up to three trips.\\n The challenge was to develop the capability to run a completion deflector with an existing pressure test tool. This was accomplished by converting the pressure test tool into a running tool. The new pressure actuated mechanism built into the tool releases the completion deflector automatically after a successful pressure test. A secondary release mechanism was also incorporated for contingency options. Extensive engineering qualification tests validated the new features to be highly reliable.\",\"PeriodicalId\":214691,\"journal\":{\"name\":\"Day 4 Thu, May 09, 2019\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, May 09, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/29481-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, May 09, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29481-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Design, Testing, and Operation of a Completion Deflector Running and Test Tool for Efficient Multilateral Completions
Trip optimization is essential in multilateral well construction, especially for extended-reach drilling (ERD) wells. This paper describes the design, testing, and operation of a completion deflector running and test tool (RTT) that was recently used during completion of one of the industry's deepest extended-reach multilateral wells. The RTT allows for running and pressure testing of a completion deflector and lower completion components in a single trip, thus saving at least one trip, and up to three trips.
The challenge was to develop the capability to run a completion deflector with an existing pressure test tool. This was accomplished by converting the pressure test tool into a running tool. The new pressure actuated mechanism built into the tool releases the completion deflector automatically after a successful pressure test. A secondary release mechanism was also incorporated for contingency options. Extensive engineering qualification tests validated the new features to be highly reliable.