提高建造业的劳动生产力

Silpa S. S
{"title":"提高建造业的劳动生产力","authors":"Silpa S. S","doi":"10.59544/flup8114/ngcesi23p108","DOIUrl":null,"url":null,"abstract":"Construction productivity has become such a buzz word and one of the most frequently researched topics. In most countries, labour cost comprises 30 to 50% of the overall project’s cost, and thus is regarded as a true reflection of the economic success of the operation. There are many challenges facing the construction industry but one of the most important is low productivity. There are many challenges facing the construction industry in Kerala, but one of the most important, the writers debate, is low productivity. Despite all the technological advancements, abundance of construction materials, tools, and financial means available to local contractors, construction costs are constantly on the rise, completion durations of projects are substantially increasing, and most projects are significantly overrunning their budgets. The objective of this research, therefore, is to identify and rank the factors that affect the labour productivity on construction sites. To achieve this objective, a statistically representative sample of contractors was invited to participate in a structured questionnaire survey, comprising 30 productivity factors, classified under the following five primary groups: (1) manpower; (2) external; (3) communication; (4) resources and (5) miscellaneous. The main aim and objective of this study focuses on views from the construction industry about various factors affecting labour productivity, analyses factors affecting the labour productivity impact, and suggests appropriate measures that can be taken to improve labour productivity.","PeriodicalId":315694,"journal":{"name":"The International Conference on scientific innovations in Science, Technology, and Management","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Improving Labour Productivity in Construction Industries\",\"authors\":\"Silpa S. S\",\"doi\":\"10.59544/flup8114/ngcesi23p108\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction productivity has become such a buzz word and one of the most frequently researched topics. In most countries, labour cost comprises 30 to 50% of the overall project’s cost, and thus is regarded as a true reflection of the economic success of the operation. There are many challenges facing the construction industry but one of the most important is low productivity. There are many challenges facing the construction industry in Kerala, but one of the most important, the writers debate, is low productivity. Despite all the technological advancements, abundance of construction materials, tools, and financial means available to local contractors, construction costs are constantly on the rise, completion durations of projects are substantially increasing, and most projects are significantly overrunning their budgets. The objective of this research, therefore, is to identify and rank the factors that affect the labour productivity on construction sites. To achieve this objective, a statistically representative sample of contractors was invited to participate in a structured questionnaire survey, comprising 30 productivity factors, classified under the following five primary groups: (1) manpower; (2) external; (3) communication; (4) resources and (5) miscellaneous. The main aim and objective of this study focuses on views from the construction industry about various factors affecting labour productivity, analyses factors affecting the labour productivity impact, and suggests appropriate measures that can be taken to improve labour productivity.\",\"PeriodicalId\":315694,\"journal\":{\"name\":\"The International Conference on scientific innovations in Science, Technology, and Management\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The International Conference on scientific innovations in Science, Technology, and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.59544/flup8114/ngcesi23p108\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The International Conference on scientific innovations in Science, Technology, and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59544/flup8114/ngcesi23p108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建筑生产率已经成为一个热词,也是研究最频繁的话题之一。在大多数国家,劳动力成本占整个项目成本的30%至50%,因此被认为是业务经济成功的真实反映。建筑业面临着许多挑战,但其中最重要的是低生产率。喀拉拉邦的建筑行业面临着许多挑战,但作者认为,其中最重要的挑战之一是生产率低下。尽管所有的技术进步,丰富的建筑材料,工具,以及当地承包商可用的财政手段,建筑成本不断上升,项目的完成时间大大增加,大多数项目都大大超出了预算。因此,本研究的目的是确定影响建筑工地劳动生产率的因素并对其进行排序。为达致这一目标,我们邀请具统计代表性的承办商样本参与一项结构化问卷调查,调查内容包括30项生产力因素,分为以下五个主要类别:(1)人力;(2)外部;(3)沟通;(四)资源;(五)杂项。本研究的主要目的和目的是收集建造业对影响劳动生产率的各种因素的看法,分析影响劳动生产率的因素,并提出适当的措施来提高劳动生产率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improving Labour Productivity in Construction Industries
Construction productivity has become such a buzz word and one of the most frequently researched topics. In most countries, labour cost comprises 30 to 50% of the overall project’s cost, and thus is regarded as a true reflection of the economic success of the operation. There are many challenges facing the construction industry but one of the most important is low productivity. There are many challenges facing the construction industry in Kerala, but one of the most important, the writers debate, is low productivity. Despite all the technological advancements, abundance of construction materials, tools, and financial means available to local contractors, construction costs are constantly on the rise, completion durations of projects are substantially increasing, and most projects are significantly overrunning their budgets. The objective of this research, therefore, is to identify and rank the factors that affect the labour productivity on construction sites. To achieve this objective, a statistically representative sample of contractors was invited to participate in a structured questionnaire survey, comprising 30 productivity factors, classified under the following five primary groups: (1) manpower; (2) external; (3) communication; (4) resources and (5) miscellaneous. The main aim and objective of this study focuses on views from the construction industry about various factors affecting labour productivity, analyses factors affecting the labour productivity impact, and suggests appropriate measures that can be taken to improve labour productivity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信