基于线性规划的多跨连续刚构桥合闸推力计算方法

F. Sun, Miaomiao Fang, Jiaxin Liu
{"title":"基于线性规划的多跨连续刚构桥合闸推力计算方法","authors":"F. Sun, Miaomiao Fang, Jiaxin Liu","doi":"10.1109/ISTTCA53489.2021.9654525","DOIUrl":null,"url":null,"abstract":"At present, there is a significant shortcomings for solving multi-cross-continuous bridge, and the rigidity: (1) The analysis of the principle of combined mechanics is only applicable to conventional three-cross-continuous frame bridge, and multi-cross-continuous bridge overhead There are many times, it is difficult to seek the analysis; (2) Other methods are repeatedly tried more than the finite element software, with random, difficult to find the optimal solution, and multi-cross-continuous rigid bridge top push must be satisfied Multiple target values and constraints, so that it is difficult to solve the difficulty in solving the trial algorithm.","PeriodicalId":383266,"journal":{"name":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","volume":"312 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Calculation Method of Pushing Force for Multi-span Continuous Rigid Frame Bridge Closure Based on Linear Programming\",\"authors\":\"F. Sun, Miaomiao Fang, Jiaxin Liu\",\"doi\":\"10.1109/ISTTCA53489.2021.9654525\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"At present, there is a significant shortcomings for solving multi-cross-continuous bridge, and the rigidity: (1) The analysis of the principle of combined mechanics is only applicable to conventional three-cross-continuous frame bridge, and multi-cross-continuous bridge overhead There are many times, it is difficult to seek the analysis; (2) Other methods are repeatedly tried more than the finite element software, with random, difficult to find the optimal solution, and multi-cross-continuous rigid bridge top push must be satisfied Multiple target values and constraints, so that it is difficult to solve the difficulty in solving the trial algorithm.\",\"PeriodicalId\":383266,\"journal\":{\"name\":\"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)\",\"volume\":\"312 4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISTTCA53489.2021.9654525\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISTTCA53489.2021.9654525","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目前,求解多跨连续梁桥存在着明显的不足,刚性问题:(1)组合力学原理的分析只适用于传统的三跨连续梁桥,而多跨连续梁桥架空次数多,难以求出分析;(2)其他方法均比有限元软件反复尝试多,具有随机性,难以找到最优解,且多跨连续刚性桥顶推必须满足多个目标值和约束条件,从而难以解决尝试算法求解困难的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Calculation Method of Pushing Force for Multi-span Continuous Rigid Frame Bridge Closure Based on Linear Programming
At present, there is a significant shortcomings for solving multi-cross-continuous bridge, and the rigidity: (1) The analysis of the principle of combined mechanics is only applicable to conventional three-cross-continuous frame bridge, and multi-cross-continuous bridge overhead There are many times, it is difficult to seek the analysis; (2) Other methods are repeatedly tried more than the finite element software, with random, difficult to find the optimal solution, and multi-cross-continuous rigid bridge top push must be satisfied Multiple target values and constraints, so that it is difficult to solve the difficulty in solving the trial algorithm.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信