{"title":"CASE工具评估和选择的关键失效点","authors":"B. Prather","doi":"10.1109/CASE.1993.634806","DOIUrl":null,"url":null,"abstract":"Selecting a CASE tool is a complicated process. Selection criteria must be determined, CASE tools must be evaluated against the criteria, and a decision must be made. Successful CASE selection, however, must go beyond technical factors and consider additional issues. The common critical failure points in these additional issues which must be addressed for the selection to be successful through the lifecycle of the tool are identified. These include getting the selection process correct, having the prerequisites in place prior to selecting tools, knowing and understanding the organization, evaluating the product under performance stress, and managing exceptions.","PeriodicalId":442754,"journal":{"name":"Proceedings of 6th International Workshop on Computer-Aided Software Engineering","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Critical failure points of CASE tool evaluation and selection\",\"authors\":\"B. Prather\",\"doi\":\"10.1109/CASE.1993.634806\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Selecting a CASE tool is a complicated process. Selection criteria must be determined, CASE tools must be evaluated against the criteria, and a decision must be made. Successful CASE selection, however, must go beyond technical factors and consider additional issues. The common critical failure points in these additional issues which must be addressed for the selection to be successful through the lifecycle of the tool are identified. These include getting the selection process correct, having the prerequisites in place prior to selecting tools, knowing and understanding the organization, evaluating the product under performance stress, and managing exceptions.\",\"PeriodicalId\":442754,\"journal\":{\"name\":\"Proceedings of 6th International Workshop on Computer-Aided Software Engineering\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-07-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 6th International Workshop on Computer-Aided Software Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CASE.1993.634806\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 6th International Workshop on Computer-Aided Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CASE.1993.634806","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Critical failure points of CASE tool evaluation and selection
Selecting a CASE tool is a complicated process. Selection criteria must be determined, CASE tools must be evaluated against the criteria, and a decision must be made. Successful CASE selection, however, must go beyond technical factors and consider additional issues. The common critical failure points in these additional issues which must be addressed for the selection to be successful through the lifecycle of the tool are identified. These include getting the selection process correct, having the prerequisites in place prior to selecting tools, knowing and understanding the organization, evaluating the product under performance stress, and managing exceptions.