军用自动测试系统的获取——海军需求官的观点

S. Paul, C. Davis
{"title":"军用自动测试系统的获取——海军需求官的观点","authors":"S. Paul, C. Davis","doi":"10.1109/AUTEST.1997.633627","DOIUrl":null,"url":null,"abstract":"In the current environment of DOD downsizing, considerable savings can be achieved by timely, appropriate ATS decisions. Frequently decisions are made in an environment where ATS and support in general is down-played in favor of more glamorous \"smoke-and-fire\" budget elements. Sometimes this is a result of inadequate preparation, sometimes from a lack of understanding of the process, almost always from a lack of knowledge regarding the funding process where support and ATS interests are represented by the Requirements Officer (RO). This paper provides an overview of the RO's perspective.","PeriodicalId":369132,"journal":{"name":"1997 IEEE Autotestcon Proceedings AUTOTESTCON '97. IEEE Systems Readiness Technology Conference. Systems Readiness Supporting Global Needs and Awareness in the 21st Century","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Military automatic test systems acquisition-the Navy Requirements Officer perspective\",\"authors\":\"S. Paul, C. Davis\",\"doi\":\"10.1109/AUTEST.1997.633627\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the current environment of DOD downsizing, considerable savings can be achieved by timely, appropriate ATS decisions. Frequently decisions are made in an environment where ATS and support in general is down-played in favor of more glamorous \\\"smoke-and-fire\\\" budget elements. Sometimes this is a result of inadequate preparation, sometimes from a lack of understanding of the process, almost always from a lack of knowledge regarding the funding process where support and ATS interests are represented by the Requirements Officer (RO). This paper provides an overview of the RO's perspective.\",\"PeriodicalId\":369132,\"journal\":{\"name\":\"1997 IEEE Autotestcon Proceedings AUTOTESTCON '97. IEEE Systems Readiness Technology Conference. Systems Readiness Supporting Global Needs and Awareness in the 21st Century\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-09-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1997 IEEE Autotestcon Proceedings AUTOTESTCON '97. IEEE Systems Readiness Technology Conference. Systems Readiness Supporting Global Needs and Awareness in the 21st Century\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AUTEST.1997.633627\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1997 IEEE Autotestcon Proceedings AUTOTESTCON '97. IEEE Systems Readiness Technology Conference. Systems Readiness Supporting Global Needs and Awareness in the 21st Century","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEST.1997.633627","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在当前国防部缩减规模的环境下,通过及时、适当的ATS决策可以实现可观的节省。决策往往是在ATS和支持通常被低估的环境中做出的,而更倾向于更迷人的“烟和火”预算元素。有时是由于准备不足,有时是由于对过程缺乏了解,几乎总是由于缺乏对供资过程的了解,在供资过程中,支持和ATS的利益由需求干事(RO)代表。本文概述了RO的观点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Military automatic test systems acquisition-the Navy Requirements Officer perspective
In the current environment of DOD downsizing, considerable savings can be achieved by timely, appropriate ATS decisions. Frequently decisions are made in an environment where ATS and support in general is down-played in favor of more glamorous "smoke-and-fire" budget elements. Sometimes this is a result of inadequate preparation, sometimes from a lack of understanding of the process, almost always from a lack of knowledge regarding the funding process where support and ATS interests are represented by the Requirements Officer (RO). This paper provides an overview of the RO's perspective.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信