{"title":"爆破几何分析,以在PT. SIS的坑北图班的最佳时间确定和缩短时间","authors":"Ahmad Erlangga Adji, M. B. Soegeng, A. S. Erusani","doi":"10.15408/jipl.v1i1.20378","DOIUrl":null,"url":null,"abstract":"Blasting activity is really important thing to support production achievement in mine. Especially on drilling and blasting production. Good drilling also will affect the fragmentation outcome. Geometry applications have to conductbased on rock characteristics in every blasting location. In this case, correlation between burden and spacing in blasting geometry, how powder factor impact to fragmentation and also digging time excavator. The impact of change geometry blasting will result the appropriate digging time from fragmentation. PT. SIS digging time target is 12 seconds for all different classes of excavators. Hence, it is expected that the acquisition of digging time is reached. Thus, the production process will be influenced.Keywords - Geometry, Fragmentation, and Digging Time","PeriodicalId":377156,"journal":{"name":"Jurnal Inovasi Pertambangan dan Lingkungan","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Geometri Peledakan Untuk Mendapatkan Hasil Fragmentasi dan Digging Time Optimal di Pit North Tutupan PT. SIS site Adaro (PT. Adaro Indonesia)\",\"authors\":\"Ahmad Erlangga Adji, M. B. Soegeng, A. S. Erusani\",\"doi\":\"10.15408/jipl.v1i1.20378\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Blasting activity is really important thing to support production achievement in mine. Especially on drilling and blasting production. Good drilling also will affect the fragmentation outcome. Geometry applications have to conductbased on rock characteristics in every blasting location. In this case, correlation between burden and spacing in blasting geometry, how powder factor impact to fragmentation and also digging time excavator. The impact of change geometry blasting will result the appropriate digging time from fragmentation. PT. SIS digging time target is 12 seconds for all different classes of excavators. Hence, it is expected that the acquisition of digging time is reached. Thus, the production process will be influenced.Keywords - Geometry, Fragmentation, and Digging Time\",\"PeriodicalId\":377156,\"journal\":{\"name\":\"Jurnal Inovasi Pertambangan dan Lingkungan\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Inovasi Pertambangan dan Lingkungan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15408/jipl.v1i1.20378\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Inovasi Pertambangan dan Lingkungan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15408/jipl.v1i1.20378","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

爆破作业是矿山生产成果的重要支撑。特别是在钻爆生产方面。良好的钻井效果也会影响压裂效果。几何应用必须根据每个爆破位置的岩石特性进行。在这种情况下,爆破几何形状中炉料与间距的相关性,粉料因素对破碎度的影响以及挖掘机的挖掘时间。变化几何爆破的影响将导致适当的破块挖掘时间。PT. SIS挖掘时间目标为12秒,适用于所有不同类型的挖掘机。因此,期望达到挖掘时间的获取。因此,生产过程将受到影响。关键词:几何,碎片,挖掘时间
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Geometri Peledakan Untuk Mendapatkan Hasil Fragmentasi dan Digging Time Optimal di Pit North Tutupan PT. SIS site Adaro (PT. Adaro Indonesia)
Blasting activity is really important thing to support production achievement in mine. Especially on drilling and blasting production. Good drilling also will affect the fragmentation outcome. Geometry applications have to conductbased on rock characteristics in every blasting location. In this case, correlation between burden and spacing in blasting geometry, how powder factor impact to fragmentation and also digging time excavator. The impact of change geometry blasting will result the appropriate digging time from fragmentation. PT. SIS digging time target is 12 seconds for all different classes of excavators. Hence, it is expected that the acquisition of digging time is reached. Thus, the production process will be influenced.Keywords - Geometry, Fragmentation, and Digging Time
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信