巴厘岛登巴萨地区建筑项目延迟的危险因素

I. G. S. Wibawa, I. M. A. Santiana, I. M. Yasa, I. W. Suasira
{"title":"巴厘岛登巴萨地区建筑项目延迟的危险因素","authors":"I. G. S. Wibawa, I. M. A. Santiana, I. M. Yasa, I. W. Suasira","doi":"10.30595/pspfs.v1i.154","DOIUrl":null,"url":null,"abstract":"The construction projects are always faced with the possibility of risk problems. The rapid development in the Denpasar area is in line with the many construction projects, especially buildings such as hotel construction, construction of new school buildings, etc. For construction projects in Denpasar, risk control is necessary. In this regard, it is necessary to research the Analysis of Risk Factors. This study aimed to determine the dominant risk factors causing construction project delays, mitigation and risk ownership of the dominant risk factors. This research used the quantitative descriptive analysis method. The measuring instrument of this study used a questionnaire and interviews with contractor respondents. Based on the results, the dominant risk analysis was labor risk with an average frequency value of 13.70 and 17.13 consequences. The dominant question from the labor risk variable was the low productivity of the workforce due to lack of experience with a frequency percentage of 46.67% who answered rarely and 53.33% who often answered. In comparison, the percentage of consequences was 70.00% answered big and 30.00% answered very largely. Risk response that can be done is to recruit new workers and place them according to their skills. The study's ownership of risk was the contractor due to the contractor's error in employing workers in the field. ","PeriodicalId":165554,"journal":{"name":"Proceedings Series on Physical & Formal Sciences","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Faktor-Faktor Risiko Terhadap Keterlambatan Proyek Konstruksi di Wilayah Denpasar, Bali\",\"authors\":\"I. G. S. Wibawa, I. M. A. Santiana, I. M. Yasa, I. W. Suasira\",\"doi\":\"10.30595/pspfs.v1i.154\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction projects are always faced with the possibility of risk problems. The rapid development in the Denpasar area is in line with the many construction projects, especially buildings such as hotel construction, construction of new school buildings, etc. For construction projects in Denpasar, risk control is necessary. In this regard, it is necessary to research the Analysis of Risk Factors. This study aimed to determine the dominant risk factors causing construction project delays, mitigation and risk ownership of the dominant risk factors. This research used the quantitative descriptive analysis method. The measuring instrument of this study used a questionnaire and interviews with contractor respondents. Based on the results, the dominant risk analysis was labor risk with an average frequency value of 13.70 and 17.13 consequences. The dominant question from the labor risk variable was the low productivity of the workforce due to lack of experience with a frequency percentage of 46.67% who answered rarely and 53.33% who often answered. In comparison, the percentage of consequences was 70.00% answered big and 30.00% answered very largely. Risk response that can be done is to recruit new workers and place them according to their skills. The study's ownership of risk was the contractor due to the contractor's error in employing workers in the field. \",\"PeriodicalId\":165554,\"journal\":{\"name\":\"Proceedings Series on Physical & Formal Sciences\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Series on Physical & Formal Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30595/pspfs.v1i.154\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Series on Physical & Formal Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30595/pspfs.v1i.154","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建设项目始终面临着风险问题的可能性。登巴萨地区的快速发展与许多建设项目相一致,特别是酒店建设、新校舍建设等建筑。对于登巴萨的建设项目,风险控制是必要的。对此,有必要对风险因素分析进行研究。本研究旨在确定造成建设项目延误的主要风险因素,以及这些主要风险因素的缓解和风险归属。本研究采用定量描述性分析方法。本研究的测量工具采用问卷调查和与承包商受访者的访谈。结果显示,劳动风险分析占主导地位,平均频率值分别为13.70和17.13个后果。劳动风险变量的主要问题是劳动力缺乏经验导致生产力低下,回答“很少”和“经常”的频率比例分别为46.67%和53.33%。相比之下,70.00%的人回答“大”,30.00%的人回答“很大”。可以采取的风险应对措施是招募新员工,并根据他们的技能对他们进行安置。该研究的风险所有权是承包商,因为承包商在现场雇用工人时犯了错误。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Faktor-Faktor Risiko Terhadap Keterlambatan Proyek Konstruksi di Wilayah Denpasar, Bali
The construction projects are always faced with the possibility of risk problems. The rapid development in the Denpasar area is in line with the many construction projects, especially buildings such as hotel construction, construction of new school buildings, etc. For construction projects in Denpasar, risk control is necessary. In this regard, it is necessary to research the Analysis of Risk Factors. This study aimed to determine the dominant risk factors causing construction project delays, mitigation and risk ownership of the dominant risk factors. This research used the quantitative descriptive analysis method. The measuring instrument of this study used a questionnaire and interviews with contractor respondents. Based on the results, the dominant risk analysis was labor risk with an average frequency value of 13.70 and 17.13 consequences. The dominant question from the labor risk variable was the low productivity of the workforce due to lack of experience with a frequency percentage of 46.67% who answered rarely and 53.33% who often answered. In comparison, the percentage of consequences was 70.00% answered big and 30.00% answered very largely. Risk response that can be done is to recruit new workers and place them according to their skills. The study's ownership of risk was the contractor due to the contractor's error in employing workers in the field. 
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信