{"title":"输电塔库存","authors":"V. Kogan, R. Gursky","doi":"10.1109/TDCLLM.1995.485037","DOIUrl":null,"url":null,"abstract":"Transmission towers for major lines constitute a critical component because it is undesirable to lose any major transmission lines for longer than a few weeks. Since tower fabrication cannot be accomplished quickly on-demand, it is important to hold an adequate inventory of transmission towers. This paper discusses a statistical procedure to analyze failure data and estimate inventory requirements for transmission towers, using a homogeneous Poisson process model.","PeriodicalId":197796,"journal":{"name":"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance","volume":"200 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Transmission towers inventory\",\"authors\":\"V. Kogan, R. Gursky\",\"doi\":\"10.1109/TDCLLM.1995.485037\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Transmission towers for major lines constitute a critical component because it is undesirable to lose any major transmission lines for longer than a few weeks. Since tower fabrication cannot be accomplished quickly on-demand, it is important to hold an adequate inventory of transmission towers. This paper discusses a statistical procedure to analyze failure data and estimate inventory requirements for transmission towers, using a homogeneous Poisson process model.\",\"PeriodicalId\":197796,\"journal\":{\"name\":\"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance\",\"volume\":\"200 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLLM.1995.485037\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1995.485037","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Transmission towers for major lines constitute a critical component because it is undesirable to lose any major transmission lines for longer than a few weeks. Since tower fabrication cannot be accomplished quickly on-demand, it is important to hold an adequate inventory of transmission towers. This paper discusses a statistical procedure to analyze failure data and estimate inventory requirements for transmission towers, using a homogeneous Poisson process model.