Off-Toyohashi电缆观测站连接单元的部署

K. Asakawa, T. Goto, T. Yokobiki, E. Araki, R. Iwase, M. Kinoshita, J. Kojima, Y. Fujii, Y. Okatake, Y. Taguchi
{"title":"Off-Toyohashi电缆观测站连接单元的部署","authors":"K. Asakawa, T. Goto, T. Yokobiki, E. Araki, R. Iwase, M. Kinoshita, J. Kojima, Y. Fujii, Y. Okatake, Y. Taguchi","doi":"10.1109/OCEANS.2007.4449179","DOIUrl":null,"url":null,"abstract":"A new cabled observatory was constructed off Toyohashi in central Japan using a pair of decommissioned underwater telecommunication cables. While providing electric power and communication line to the underwater observatory, the cables will be used as a long active antenna to monitor the electro-magnetic properties of the Earth's crust that are related to water contents. To secure a safe deployment of the junction unit at the end of the cable, we conducted computer simulations before the deployment. The junction units must usually be placed exactly as planned. This paper presents that the simulation results coincide with the actual construction result.","PeriodicalId":214543,"journal":{"name":"OCEANS 2007","volume":"28 2-3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Deployment of the junction unit for Off-Toyohashi cabled observatory\",\"authors\":\"K. Asakawa, T. Goto, T. Yokobiki, E. Araki, R. Iwase, M. Kinoshita, J. Kojima, Y. Fujii, Y. Okatake, Y. Taguchi\",\"doi\":\"10.1109/OCEANS.2007.4449179\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A new cabled observatory was constructed off Toyohashi in central Japan using a pair of decommissioned underwater telecommunication cables. While providing electric power and communication line to the underwater observatory, the cables will be used as a long active antenna to monitor the electro-magnetic properties of the Earth's crust that are related to water contents. To secure a safe deployment of the junction unit at the end of the cable, we conducted computer simulations before the deployment. The junction units must usually be placed exactly as planned. This paper presents that the simulation results coincide with the actual construction result.\",\"PeriodicalId\":214543,\"journal\":{\"name\":\"OCEANS 2007\",\"volume\":\"28 2-3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"OCEANS 2007\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/OCEANS.2007.4449179\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"OCEANS 2007","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/OCEANS.2007.4449179","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在日本中部的丰桥附近建造了一个新的有线天文台,使用了一对退役的水下电信电缆。在为水下观测站提供电力和通信线路的同时,这些电缆将被用作监测与含水量有关的地壳电磁特性的长有源天线。为了确保连接单元在电缆末端的安全部署,我们在部署之前进行了计算机模拟。连接单元通常必须完全按照计划放置。仿真结果与实际施工结果吻合较好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Deployment of the junction unit for Off-Toyohashi cabled observatory
A new cabled observatory was constructed off Toyohashi in central Japan using a pair of decommissioned underwater telecommunication cables. While providing electric power and communication line to the underwater observatory, the cables will be used as a long active antenna to monitor the electro-magnetic properties of the Earth's crust that are related to water contents. To secure a safe deployment of the junction unit at the end of the cable, we conducted computer simulations before the deployment. The junction units must usually be placed exactly as planned. This paper presents that the simulation results coincide with the actual construction result.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信