柔性制造系统中的速度平衡

A. Kobetski, Martin Fabian
{"title":"柔性制造系统中的速度平衡","authors":"A. Kobetski, Martin Fabian","doi":"10.1109/WODES.2008.4605972","DOIUrl":null,"url":null,"abstract":"Practical incentives motivate the development of optimal working schedules in manufacturing environments. Most often, such development is focused on time optimality issues, without concern for how the resulting schedules are executed. In practice, this often leads to an unnecessarily high amount of acceleration during a production cycle, which affects negatively the productive life of the manufacturing equipment. In this paper, we present and compare several methods to reduce the acceleration load in a production cell by processing a given working schedule, without compromising such features of the schedule as cycle time optimality, collision- and deadlock avoidance.","PeriodicalId":105225,"journal":{"name":"2008 9th International Workshop on Discrete Event Systems","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Velocity balancing in flexible manufacturing systems\",\"authors\":\"A. Kobetski, Martin Fabian\",\"doi\":\"10.1109/WODES.2008.4605972\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Practical incentives motivate the development of optimal working schedules in manufacturing environments. Most often, such development is focused on time optimality issues, without concern for how the resulting schedules are executed. In practice, this often leads to an unnecessarily high amount of acceleration during a production cycle, which affects negatively the productive life of the manufacturing equipment. In this paper, we present and compare several methods to reduce the acceleration load in a production cell by processing a given working schedule, without compromising such features of the schedule as cycle time optimality, collision- and deadlock avoidance.\",\"PeriodicalId\":105225,\"journal\":{\"name\":\"2008 9th International Workshop on Discrete Event Systems\",\"volume\":\"51 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 9th International Workshop on Discrete Event Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WODES.2008.4605972\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 9th International Workshop on Discrete Event Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WODES.2008.4605972","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

在制造环境中,实际的激励机制激励着最佳工作时间表的发展。大多数情况下,这样的开发集中在时间最优性问题上,而不关心如何执行最终的时间表。在实践中,这通常会导致生产周期中不必要的高加速量,从而对制造设备的生产寿命产生负面影响。在本文中,我们提出并比较了几种通过处理给定的工作计划来减少生产单元中的加速负荷的方法,而不损害计划的周期时间最优性,避免碰撞和死锁等特征。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Velocity balancing in flexible manufacturing systems
Practical incentives motivate the development of optimal working schedules in manufacturing environments. Most often, such development is focused on time optimality issues, without concern for how the resulting schedules are executed. In practice, this often leads to an unnecessarily high amount of acceleration during a production cycle, which affects negatively the productive life of the manufacturing equipment. In this paper, we present and compare several methods to reduce the acceleration load in a production cell by processing a given working schedule, without compromising such features of the schedule as cycle time optimality, collision- and deadlock avoidance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信