35kv级海底电缆工作条件的验证

S. Rosales, B. Vargas, M. Pimentel
{"title":"35kv级海底电缆工作条件的验证","authors":"S. Rosales, B. Vargas, M. Pimentel","doi":"10.5935/2447-0228.20170084","DOIUrl":null,"url":null,"abstract":"In 1997 a Class 35 kV submarine cable was installed in the Sonda de Campeche, Mexico, for the distribution of electrical energy to several offshore oil production platforms. The installation site is made up of seven marine platforms linked to each other by an electrical network in 34.5 kV. During the installation of the cable, there were some problems in the laying, forming \"loops\", which led to apply a greater mechanical effort to the cable. After the installation of all cable sections, an off-line evaluation was performed by measuring partial discharges with CA. In 2009, a new evaluation of the submarine cable was carried out by measuring partial discharges in line. The method used for the measurement of DP, is based on a detection system by means of a current sensor for high frequency (UWB), tuned to a frequency of 80 MHz. This paper describes the monitoring of the submarine cable since its installation, evaluation by measuring partial discharges (DP) with CA before commissioning, and its evaluation after twelve years in operation.","PeriodicalId":236176,"journal":{"name":"Journal of Engineering and Technology for Industrial Applications","volume":"36 5","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Verification of the Operating Conditions of a Submarine Cable Class 35 kV\",\"authors\":\"S. Rosales, B. Vargas, M. Pimentel\",\"doi\":\"10.5935/2447-0228.20170084\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In 1997 a Class 35 kV submarine cable was installed in the Sonda de Campeche, Mexico, for the distribution of electrical energy to several offshore oil production platforms. The installation site is made up of seven marine platforms linked to each other by an electrical network in 34.5 kV. During the installation of the cable, there were some problems in the laying, forming \\\"loops\\\", which led to apply a greater mechanical effort to the cable. After the installation of all cable sections, an off-line evaluation was performed by measuring partial discharges with CA. In 2009, a new evaluation of the submarine cable was carried out by measuring partial discharges in line. The method used for the measurement of DP, is based on a detection system by means of a current sensor for high frequency (UWB), tuned to a frequency of 80 MHz. This paper describes the monitoring of the submarine cable since its installation, evaluation by measuring partial discharges (DP) with CA before commissioning, and its evaluation after twelve years in operation.\",\"PeriodicalId\":236176,\"journal\":{\"name\":\"Journal of Engineering and Technology for Industrial Applications\",\"volume\":\"36 5\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering and Technology for Industrial Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5935/2447-0228.20170084\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering and Technology for Industrial Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5935/2447-0228.20170084","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

1997年,一条35kv级海底电缆在墨西哥的Sonda de Campeche安装,用于向几个海上石油生产平台分配电能。安装地点由七个海上平台组成,通过34.5千伏的电网相互连接。在电缆安装过程中,敷设出现了一些问题,形成了“圈圈”,导致对电缆施加更大的机械力。在安装完所有电缆段后,通过CA测量部分放电进行了离线评估。2009年,通过在线测量部分放电对海底电缆进行了新的评估。用于测量DP的方法,是基于一个检测系统,通过一个高频电流传感器(UWB),调谐到80mhz的频率。本文介绍了海底电缆自安装以来的监测情况、调试前用CA测量局部放电的评估情况以及运行12年后的评估情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Verification of the Operating Conditions of a Submarine Cable Class 35 kV
In 1997 a Class 35 kV submarine cable was installed in the Sonda de Campeche, Mexico, for the distribution of electrical energy to several offshore oil production platforms. The installation site is made up of seven marine platforms linked to each other by an electrical network in 34.5 kV. During the installation of the cable, there were some problems in the laying, forming "loops", which led to apply a greater mechanical effort to the cable. After the installation of all cable sections, an off-line evaluation was performed by measuring partial discharges with CA. In 2009, a new evaluation of the submarine cable was carried out by measuring partial discharges in line. The method used for the measurement of DP, is based on a detection system by means of a current sensor for high frequency (UWB), tuned to a frequency of 80 MHz. This paper describes the monitoring of the submarine cable since its installation, evaluation by measuring partial discharges (DP) with CA before commissioning, and its evaluation after twelve years in operation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.60
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信