利用存档数据实时验证电力系统模型

F. Ahmad, M. Nayeem
{"title":"利用存档数据实时验证电力系统模型","authors":"F. Ahmad, M. Nayeem","doi":"10.1109/SECON.2012.6196911","DOIUrl":null,"url":null,"abstract":"This paper presents the experiences in enhancement of Energy Management System (EMS) real time model, development and implementation of an application and methodologies to validate the EMS model at Vermont Electric Power Company (VELCO), a `transmission only' company in Vermont and a Local Control Center (LCC) for Independent System Operator in New England (ISO-NE). Methodology is developed for comprehensive model enhancement with integrated and iterative validation processes based on data from Common Information Model (CIM) of ISO-NE, neighboring areas, engineering and planning model data. An application is developed based on a scheme to validate the model and its results using archived data and historical events. Test cases are developed to validate the model and model results, indicating the improvement achieved with the model validation practice and in determining model accuracy. In addition resourcefulness of validation as an aid for system tuning and studies is also presented.","PeriodicalId":187091,"journal":{"name":"2012 Proceedings of IEEE Southeastcon","volume":"161 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Real time power system model validation using archived data\",\"authors\":\"F. Ahmad, M. Nayeem\",\"doi\":\"10.1109/SECON.2012.6196911\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the experiences in enhancement of Energy Management System (EMS) real time model, development and implementation of an application and methodologies to validate the EMS model at Vermont Electric Power Company (VELCO), a `transmission only' company in Vermont and a Local Control Center (LCC) for Independent System Operator in New England (ISO-NE). Methodology is developed for comprehensive model enhancement with integrated and iterative validation processes based on data from Common Information Model (CIM) of ISO-NE, neighboring areas, engineering and planning model data. An application is developed based on a scheme to validate the model and its results using archived data and historical events. Test cases are developed to validate the model and model results, indicating the improvement achieved with the model validation practice and in determining model accuracy. In addition resourcefulness of validation as an aid for system tuning and studies is also presented.\",\"PeriodicalId\":187091,\"journal\":{\"name\":\"2012 Proceedings of IEEE Southeastcon\",\"volume\":\"161 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-03-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 Proceedings of IEEE Southeastcon\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SECON.2012.6196911\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Proceedings of IEEE Southeastcon","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SECON.2012.6196911","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文介绍了在佛蒙特州电力公司(VELCO)、佛蒙特州一家“纯输电”公司和新英格兰独立系统运营商(ISO-NE)的本地控制中心(LCC)验证能源管理系统(EMS)实时模型的经验、应用程序的开发和实施以及验证EMS模型的方法。基于ISO-NE公共信息模型(Common Information model, CIM)数据、邻近区域数据、工程和规划模型数据,开发了基于集成和迭代验证过程的综合模型增强方法。基于使用存档数据和历史事件验证模型及其结果的方案,开发了一个应用程序。开发测试用例来验证模型和模型结果,表明通过模型验证实践和确定模型准确性所取得的改进。此外,还介绍了验证的智谋性,作为系统调优和研究的辅助。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Real time power system model validation using archived data
This paper presents the experiences in enhancement of Energy Management System (EMS) real time model, development and implementation of an application and methodologies to validate the EMS model at Vermont Electric Power Company (VELCO), a `transmission only' company in Vermont and a Local Control Center (LCC) for Independent System Operator in New England (ISO-NE). Methodology is developed for comprehensive model enhancement with integrated and iterative validation processes based on data from Common Information Model (CIM) of ISO-NE, neighboring areas, engineering and planning model data. An application is developed based on a scheme to validate the model and its results using archived data and historical events. Test cases are developed to validate the model and model results, indicating the improvement achieved with the model validation practice and in determining model accuracy. In addition resourcefulness of validation as an aid for system tuning and studies is also presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信