机器人装配单元质量保证的实现

T. Szalay, F. Alpek
{"title":"机器人装配单元质量保证的实现","authors":"T. Szalay, F. Alpek","doi":"10.1109/ISIE.1999.798738","DOIUrl":null,"url":null,"abstract":"The paper presents a realized automated quality assurance system for the final assembly of a magnetic valve. The realization project joined to an international research project sponsored by the European Union however the quality assurance was not in the frame of that project. The system includes: (1) the supervision of the assembly cell and operations; (2) the functional test of the assembled valve; and (3) the automatic documentation and part following system. For realizing the aforementioned three components the original concept was worked out, the necessary design and plan were completed, the hardware and sensors were produced or installed, and the software was programmed. In the realization we had to consider the previously realized assembly cell, some economical constraints and the restrictions of the quality standard. The realized system has a close connection with the actual assembly process but the concept and the solution of the components can be applied generally after some not significant modification.","PeriodicalId":227402,"journal":{"name":"ISIE '99. Proceedings of the IEEE International Symposium on Industrial Electronics (Cat. No.99TH8465)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1999-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Realization of the quality assurance for robotized assembly cell\",\"authors\":\"T. Szalay, F. Alpek\",\"doi\":\"10.1109/ISIE.1999.798738\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents a realized automated quality assurance system for the final assembly of a magnetic valve. The realization project joined to an international research project sponsored by the European Union however the quality assurance was not in the frame of that project. The system includes: (1) the supervision of the assembly cell and operations; (2) the functional test of the assembled valve; and (3) the automatic documentation and part following system. For realizing the aforementioned three components the original concept was worked out, the necessary design and plan were completed, the hardware and sensors were produced or installed, and the software was programmed. In the realization we had to consider the previously realized assembly cell, some economical constraints and the restrictions of the quality standard. The realized system has a close connection with the actual assembly process but the concept and the solution of the components can be applied generally after some not significant modification.\",\"PeriodicalId\":227402,\"journal\":{\"name\":\"ISIE '99. Proceedings of the IEEE International Symposium on Industrial Electronics (Cat. No.99TH8465)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-07-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ISIE '99. Proceedings of the IEEE International Symposium on Industrial Electronics (Cat. No.99TH8465)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISIE.1999.798738\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ISIE '99. Proceedings of the IEEE International Symposium on Industrial Electronics (Cat. No.99TH8465)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISIE.1999.798738","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍了一种实现的电磁阀总装自动化质量保证系统。实现项目加入了欧洲联盟赞助的一个国际研究项目,但质量保证不在该项目的框架内。该系统包括:(1)对装配单元和作业的监督;(2)组装阀门的功能试验;(3)自动文档和零件跟踪系统。为了实现上述三个组件,我们提出了最初的概念,完成了必要的设计和规划,制作或安装了硬件和传感器,并编写了软件。在实现过程中,必须考虑先前实现的装配单元、一些经济约束和质量标准的限制。所实现的系统与实际装配过程有密切的联系,但部件的概念和解决方案经过一些不太大的修改后可以普遍应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Realization of the quality assurance for robotized assembly cell
The paper presents a realized automated quality assurance system for the final assembly of a magnetic valve. The realization project joined to an international research project sponsored by the European Union however the quality assurance was not in the frame of that project. The system includes: (1) the supervision of the assembly cell and operations; (2) the functional test of the assembled valve; and (3) the automatic documentation and part following system. For realizing the aforementioned three components the original concept was worked out, the necessary design and plan were completed, the hardware and sensors were produced or installed, and the software was programmed. In the realization we had to consider the previously realized assembly cell, some economical constraints and the restrictions of the quality standard. The realized system has a close connection with the actual assembly process but the concept and the solution of the components can be applied generally after some not significant modification.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信