以商业休眠条款对抗国家输变电建设优先权法的反竞争、反输电发展效应

Walker Mogen
{"title":"以商业休眠条款对抗国家输变电建设优先权法的反竞争、反输电发展效应","authors":"Walker Mogen","doi":"10.36640/mjeal.12.2.dormant","DOIUrl":null,"url":null,"abstract":"To quickly decarbonize the electricity grid, new sources of renewable energy have to be connected to the grid. To connect these sources of energy to the grid, the rate of construction of new electricity infrastructure must increase quickly. The process to construct new electricity transmission infrastructure, however, is filled with chokepoints that slow its construction. State right of first refusal laws for transmission construction are one the things slowing the build out of the grid. These laws limit which companies can construct new transmission infrastructure to utilities and other companies already operating transmission infrastructure in a state. This Note, using a circuit split between the Fifth and Eighth Circuits as a jumping off point, argues that these state right of first refusal laws violate the dormant Commerce Clause because they serve as impermissible local presence requirements that prevent companies not already operating in a state from accessing and competing in a state’s markets. The Note concludes by analyzing how the Supreme Court would potentially rule if they resolved this Circuit split.","PeriodicalId":302203,"journal":{"name":"Michigan Journal of Environmental & Administrative Law","volume":"10 6","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Dormant Commerce Clause as a Way to Combat the Anti-Competitive, Anti-Transmission-Development Effects of State Right of First Refusal Laws for Electricity Transmission Construction\",\"authors\":\"Walker Mogen\",\"doi\":\"10.36640/mjeal.12.2.dormant\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To quickly decarbonize the electricity grid, new sources of renewable energy have to be connected to the grid. To connect these sources of energy to the grid, the rate of construction of new electricity infrastructure must increase quickly. The process to construct new electricity transmission infrastructure, however, is filled with chokepoints that slow its construction. State right of first refusal laws for transmission construction are one the things slowing the build out of the grid. These laws limit which companies can construct new transmission infrastructure to utilities and other companies already operating transmission infrastructure in a state. This Note, using a circuit split between the Fifth and Eighth Circuits as a jumping off point, argues that these state right of first refusal laws violate the dormant Commerce Clause because they serve as impermissible local presence requirements that prevent companies not already operating in a state from accessing and competing in a state’s markets. The Note concludes by analyzing how the Supreme Court would potentially rule if they resolved this Circuit split.\",\"PeriodicalId\":302203,\"journal\":{\"name\":\"Michigan Journal of Environmental & Administrative Law\",\"volume\":\"10 6\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Michigan Journal of Environmental & Administrative Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36640/mjeal.12.2.dormant\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Michigan Journal of Environmental & Administrative Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36640/mjeal.12.2.dormant","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了迅速使电网脱碳,必须将新的可再生能源接入电网。为了将这些能源接入电网,新的电力基础设施的建设速度必须加快。然而,建设新的输电基础设施的过程充满了阻碍其建设的瓶颈。输电建设的国家优先购买权法律是减缓电网建设的因素之一。这些法律限制了哪些公司可以建设新的输电基础设施,只有公用事业公司和其他已经在一个州运营输电基础设施的公司可以。本说明以第五巡回法院和第八巡回法院之间的一个巡回法院为出发点,认为这些州优先拒绝权法违反了休眠的商业条款,因为它们作为不允许的当地存在要求,阻止了尚未在该州经营的公司进入该州市场并在该州市场竞争。报告最后分析了如果最高法院解决了巡回法院的分歧,最高法院可能会如何裁决。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Dormant Commerce Clause as a Way to Combat the Anti-Competitive, Anti-Transmission-Development Effects of State Right of First Refusal Laws for Electricity Transmission Construction
To quickly decarbonize the electricity grid, new sources of renewable energy have to be connected to the grid. To connect these sources of energy to the grid, the rate of construction of new electricity infrastructure must increase quickly. The process to construct new electricity transmission infrastructure, however, is filled with chokepoints that slow its construction. State right of first refusal laws for transmission construction are one the things slowing the build out of the grid. These laws limit which companies can construct new transmission infrastructure to utilities and other companies already operating transmission infrastructure in a state. This Note, using a circuit split between the Fifth and Eighth Circuits as a jumping off point, argues that these state right of first refusal laws violate the dormant Commerce Clause because they serve as impermissible local presence requirements that prevent companies not already operating in a state from accessing and competing in a state’s markets. The Note concludes by analyzing how the Supreme Court would potentially rule if they resolved this Circuit split.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信