项目管理能力水平的实证研究

T. McBride, B. Henderson-Sellers, D. Zowghi
{"title":"项目管理能力水平的实证研究","authors":"T. McBride, B. Henderson-Sellers, D. Zowghi","doi":"10.1109/APSEC.2004.77","DOIUrl":null,"url":null,"abstract":"This paper outlines existing maturity models of project management and their underlying constructs. Organizations involved in software development in Sydney, Australia were interviewed about their project management practices and their responses analysed to determine whether different project managers used different levels of project management practices and whether the practices were in accordance with a process based maturity model. This did not seem to be the case, yet the data suggested that, as a possible alternative, a systems theory based approach might be more tenable. The overall conclusion, that a system theory based maturity model appears to be better correlated with organizational size and software development maturity than a process based maturity model, is briefly discussed and additional research is suggested that could investigate this novel conclusion further.","PeriodicalId":213849,"journal":{"name":"11th Asia-Pacific Software Engineering Conference","volume":"66 18","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":"{\"title\":\"Project management capability levels: an empirical study\",\"authors\":\"T. McBride, B. Henderson-Sellers, D. Zowghi\",\"doi\":\"10.1109/APSEC.2004.77\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper outlines existing maturity models of project management and their underlying constructs. Organizations involved in software development in Sydney, Australia were interviewed about their project management practices and their responses analysed to determine whether different project managers used different levels of project management practices and whether the practices were in accordance with a process based maturity model. This did not seem to be the case, yet the data suggested that, as a possible alternative, a systems theory based approach might be more tenable. The overall conclusion, that a system theory based maturity model appears to be better correlated with organizational size and software development maturity than a process based maturity model, is briefly discussed and additional research is suggested that could investigate this novel conclusion further.\",\"PeriodicalId\":213849,\"journal\":{\"name\":\"11th Asia-Pacific Software Engineering Conference\",\"volume\":\"66 18\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"20\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th Asia-Pacific Software Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/APSEC.2004.77\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th Asia-Pacific Software Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APSEC.2004.77","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 20

摘要

本文概述了现有的项目管理成熟度模型及其基础结构。在澳大利亚悉尼,参与软件开发的组织接受了关于他们的项目管理实践的采访,并分析了他们的回答,以确定不同的项目经理是否使用不同级别的项目管理实践,以及这些实践是否与基于过程的成熟度模型相一致。事实似乎并非如此,但数据表明,作为一种可能的替代方案,基于系统理论的方法可能更站得住脚。本文简要讨论了基于系统理论的成熟度模型比基于过程的成熟度模型与组织规模和软件开发成熟度的相关性更好这一总体结论,并建议进一步研究这一新结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project management capability levels: an empirical study
This paper outlines existing maturity models of project management and their underlying constructs. Organizations involved in software development in Sydney, Australia were interviewed about their project management practices and their responses analysed to determine whether different project managers used different levels of project management practices and whether the practices were in accordance with a process based maturity model. This did not seem to be the case, yet the data suggested that, as a possible alternative, a systems theory based approach might be more tenable. The overall conclusion, that a system theory based maturity model appears to be better correlated with organizational size and software development maturity than a process based maturity model, is briefly discussed and additional research is suggested that could investigate this novel conclusion further.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信