CIKAWARI 2A和5A水库研究万隆供水需求的可行性

Cleon Christopher, Doddi Yudianto, Albert Wicaksono
{"title":"CIKAWARI 2A和5A水库研究万隆供水需求的可行性","authors":"Cleon Christopher, Doddi Yudianto, Albert Wicaksono","doi":"10.32679/JTH.V12I1.654","DOIUrl":null,"url":null,"abstract":"The water need in the Northern area of Bandung City was predicted to be 2.49 m3/s in 2040. The government responded to this issue by planning the construction of several reservoirs in the Cikapundung watershed. A previous study suggested three potential locations, i.e., Cikukang 2, Cikawari 2A, and Cikawari 5A reservoir. Since Cikawari 2A and Cikawari 5A are located on the same Cikawari river, three construction alternatives, i.e., a single reservoir of Cikawari 2A, a single reservoir of Cikawari 5A, and cascade reservoir Cikawari 2A+5A are proposed. Each alternative has its own advantages and limitations, thus evaluation of the best construction alternative needs to be carried out. The evaluation was conducted based on their reliable service in supplying water to Bandung City. This evaluation was analyzed by comparing the projected water demand following population growth and water availability derived from the rainfall-runoff model, NRECA. The analysis was conducted using two variations of dam height and reservoir capacity for each alternative. Based on the analysis results, the single reservoir of Cikawari 2A with 45 m of dam’s height was chosen as the most suitable alternative. It can supply 0.56 m3/s of water and provide water for 30.4% of the citizens in 2020, and decrease to 30.15% in 2040. However, it was also found that the reservoir could only supply 0.44 m3/s of water during the dry period. These results showed that the construction of the reservoir itself could not meet the total water demand. Therefore, another alternative is required to closing the gap in water demand.Keywords: Cikapundung watershed, water supply, Cikawari reservoir, reservoir simulation, service reliability","PeriodicalId":356205,"journal":{"name":"JURNAL TEKNIK HIDRAULIK","volume":"244 9","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"STUDI KELAYAKAN WADUK CIKAWARI 2A DAN 5A DALAM RANGKA PEMENUHAN KEBUTUHAN AIR KOTA BANDUNG\",\"authors\":\"Cleon Christopher, Doddi Yudianto, Albert Wicaksono\",\"doi\":\"10.32679/JTH.V12I1.654\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The water need in the Northern area of Bandung City was predicted to be 2.49 m3/s in 2040. The government responded to this issue by planning the construction of several reservoirs in the Cikapundung watershed. A previous study suggested three potential locations, i.e., Cikukang 2, Cikawari 2A, and Cikawari 5A reservoir. Since Cikawari 2A and Cikawari 5A are located on the same Cikawari river, three construction alternatives, i.e., a single reservoir of Cikawari 2A, a single reservoir of Cikawari 5A, and cascade reservoir Cikawari 2A+5A are proposed. Each alternative has its own advantages and limitations, thus evaluation of the best construction alternative needs to be carried out. The evaluation was conducted based on their reliable service in supplying water to Bandung City. This evaluation was analyzed by comparing the projected water demand following population growth and water availability derived from the rainfall-runoff model, NRECA. The analysis was conducted using two variations of dam height and reservoir capacity for each alternative. Based on the analysis results, the single reservoir of Cikawari 2A with 45 m of dam’s height was chosen as the most suitable alternative. It can supply 0.56 m3/s of water and provide water for 30.4% of the citizens in 2020, and decrease to 30.15% in 2040. However, it was also found that the reservoir could only supply 0.44 m3/s of water during the dry period. These results showed that the construction of the reservoir itself could not meet the total water demand. Therefore, another alternative is required to closing the gap in water demand.Keywords: Cikapundung watershed, water supply, Cikawari reservoir, reservoir simulation, service reliability\",\"PeriodicalId\":356205,\"journal\":{\"name\":\"JURNAL TEKNIK HIDRAULIK\",\"volume\":\"244 9\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JURNAL TEKNIK HIDRAULIK\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32679/JTH.V12I1.654\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL TEKNIK HIDRAULIK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32679/JTH.V12I1.654","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

万隆市北部地区2040年的需水量预计为2.49立方米/秒。针对这一问题,政府计划在赤卡朋洞流域建设几个水库。先前的研究提出了三个潜在的位置,即Cikukang 2, Cikawari 2A和Cikawari 5A油藏。由于Cikawari 2A和Cikawari 5A位于同一条Cikawari河上,提出了Cikawari 2A单水库、Cikawari 5A单水库、Cikawari 2A+5A梯级水库三种建设方案。每种方案都有自己的优点和局限性,因此需要对最佳施工方案进行评估。评价是根据他们向万隆市供水的可靠服务进行的。通过比较人口增长后的预计需水量和NRECA降雨径流模型得出的可用水量,对这一评价进行了分析。分析采用大坝高度和水库容量的两种变化进行。根据分析结果,选择坝高45 m的Cikawari 2A水库为最合适的方案。供水能力为0.56 m3/s, 2020年为30.4%的居民供水,2040年下降到30.15%。但也发现水库在枯水期的供水量仅为0.44 m3/s。这些结果表明,水库建设本身不能满足总需水量。因此,需要另一种替代方案来缩小水需求的差距。关键词:赤卡蓬洞流域;供水;赤卡瓦里水库
本文章由计算机程序翻译,如有差异,请以英文原文为准。
STUDI KELAYAKAN WADUK CIKAWARI 2A DAN 5A DALAM RANGKA PEMENUHAN KEBUTUHAN AIR KOTA BANDUNG
The water need in the Northern area of Bandung City was predicted to be 2.49 m3/s in 2040. The government responded to this issue by planning the construction of several reservoirs in the Cikapundung watershed. A previous study suggested three potential locations, i.e., Cikukang 2, Cikawari 2A, and Cikawari 5A reservoir. Since Cikawari 2A and Cikawari 5A are located on the same Cikawari river, three construction alternatives, i.e., a single reservoir of Cikawari 2A, a single reservoir of Cikawari 5A, and cascade reservoir Cikawari 2A+5A are proposed. Each alternative has its own advantages and limitations, thus evaluation of the best construction alternative needs to be carried out. The evaluation was conducted based on their reliable service in supplying water to Bandung City. This evaluation was analyzed by comparing the projected water demand following population growth and water availability derived from the rainfall-runoff model, NRECA. The analysis was conducted using two variations of dam height and reservoir capacity for each alternative. Based on the analysis results, the single reservoir of Cikawari 2A with 45 m of dam’s height was chosen as the most suitable alternative. It can supply 0.56 m3/s of water and provide water for 30.4% of the citizens in 2020, and decrease to 30.15% in 2040. However, it was also found that the reservoir could only supply 0.44 m3/s of water during the dry period. These results showed that the construction of the reservoir itself could not meet the total water demand. Therefore, another alternative is required to closing the gap in water demand.Keywords: Cikapundung watershed, water supply, Cikawari reservoir, reservoir simulation, service reliability
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信