Kaunertal水电站从岩石支撑过渡到无支撑钢衬砌压力隧道的应变测量

P. Bonapace, A. Hammer
{"title":"Kaunertal水电站从岩石支撑过渡到无支撑钢衬砌压力隧道的应变测量","authors":"P. Bonapace, A. Hammer","doi":"10.1002/geot.201700021","DOIUrl":null,"url":null,"abstract":"A new steel‐lined pressure shaft was constructed for the existing Kaunertal high‐head hydropower plant in the years 2012 to 2015. Before starting operation, initial filling tests were carried out in particular to investigate the behaviour of a steel penstock at the transition from a steel lined pressure tunnel to an open pipe section. Cases with and without steel ring bearings (thrust rings) to transfer the end loads to the rock mass were numerically analysed and compared to measurements. A conclusion is drawn from the measurement results how to arrange and analyse such a steel pipe transition into the rock mass, which may for example occur at valve chambers.","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Strain measurements at the transition from a rock supported to an unsupported steel lined pressure tunnel at the Kaunertal hydropower station\",\"authors\":\"P. Bonapace, A. Hammer\",\"doi\":\"10.1002/geot.201700021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A new steel‐lined pressure shaft was constructed for the existing Kaunertal high‐head hydropower plant in the years 2012 to 2015. Before starting operation, initial filling tests were carried out in particular to investigate the behaviour of a steel penstock at the transition from a steel lined pressure tunnel to an open pipe section. Cases with and without steel ring bearings (thrust rings) to transfer the end loads to the rock mass were numerically analysed and compared to measurements. A conclusion is drawn from the measurement results how to arrange and analyse such a steel pipe transition into the rock mass, which may for example occur at valve chambers.\",\"PeriodicalId\":170042,\"journal\":{\"name\":\"Geomechanics and Tunnelling\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geomechanics and Tunnelling\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/geot.201700021\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.201700021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2012年至2015年,为现有的Kaunertal高水头水电站建造了一条新的钢衬压力井。在开始作业之前,进行了初始填充试验,特别研究了钢压力管道从钢衬砌压力隧道过渡到开口管道段时的性能。在有和没有钢环轴承(推力环)的情况下,将端载荷传递给岩体进行了数值分析,并与测量结果进行了比较。从测量结果中得出了如何安排和分析这种钢管进入岩体的过渡,例如可能发生在阀室。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Strain measurements at the transition from a rock supported to an unsupported steel lined pressure tunnel at the Kaunertal hydropower station
A new steel‐lined pressure shaft was constructed for the existing Kaunertal high‐head hydropower plant in the years 2012 to 2015. Before starting operation, initial filling tests were carried out in particular to investigate the behaviour of a steel penstock at the transition from a steel lined pressure tunnel to an open pipe section. Cases with and without steel ring bearings (thrust rings) to transfer the end loads to the rock mass were numerically analysed and compared to measurements. A conclusion is drawn from the measurement results how to arrange and analyse such a steel pipe transition into the rock mass, which may for example occur at valve chambers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信